Version 1.04
March 2011
APEX cbt
Page 11
www.blazeking.com
INSTALLATION INSTRUCTIONS
LOCATION FURNACE
The Apex CBT is intended to be installed in a basement, the Apex is
NOT
approved for a
counter flow installation. Ceiling height of the furnace room needs to be a minimum of
6’ 6”(1.98 M).
Hot air Plenum and Ductwork can only run Horizontally or Up,
NEVER down.
The APEX CBT can be located on either side of the alternate furnace. Minimum size of the in-
terconnect duct is 12 in. x 17 in. Typical installations see fig. 3.
The interconnect duct opening can be cut on either side of the Apex CBT, depending where
the existing or alternate furnace is located. Cut the opening max. 1 1/2 inches from the floor
and locate close to the front, about 8” (Distance A, see fig. 4 ).The side panel can be taken of
for easier cutting.
Note the bypass handle is located on the left side of the Apex, but can be moved to the right
side, this might be required in some installations to clear return air plenum or counter flow ex-
isting or alternate furnace. See page 14 for instructions.
Fig. 1b
Always maintain sufficient space for servicing unit & accessing fluepipe for cleaning.
Can be as little as 6” but 8” is recommended for easier access to the bypass handle
Содержание APEX CBT
Страница 37: ...Version 1 04 March 2011 APEX cbt Page 37 www blazeking com BRICK LAYOUT ...
Страница 40: ...Version 1 04 March 2011 APEX cbt Page 40 www blazeking com Stainless steel same cleaning procedure ...
Страница 41: ...Version 1 04 March 2011 APEX cbt Page 41 www blazeking com ...
Страница 42: ...Version 1 04 March 2011 APEX cbt Page 42 www blazeking com ...