_________________________________________PLT40 / PLT55______________________________________
14
2.
Lower the lift to the place where it is to be installed using a load lifting equipment with sufficient capacity. While
doing this, keep in mind the locations of the hose connections.
Lay the hydraulic pipes and the pneumatic hoses on the ground, between the pump and the elevator and
cover them with the plates supplied for this purpose.
3.
Now connect the hydraulic and pneumatic hoses to the valve block of the pump. (Figure 14)
4.
Now connect the electric cables of the lift to connection 3. (Figure 14)
FILLING THE HYDRAULIC SYSTEM
Fill the tank with
BLACKHAWK
® LX22Y hydraulic oil around (6L for
PLT40
/ 11L for
PLT55
). (Figure 14)
Figure 14
Oil filler cap
HYDRAULIC AND PNEUMATIC CONNECTIONS
Mounting on PLT40
Figure 15
Mounting on PLT40 or on PLT55 (twice)
Mounting on PLT55
Figure 16
Figure 17