5 • Troubleshooting and maintenance
Model LRA2900A RAS Getting Started Guide
65
Maintenance
15. Click on
HOME
under the
Configuration Menu
, then click on the
Hard Reset
button under
Immediate
Actions
.
Note
Do not
select
Record Current Configuration
after importing configu-
ration parameters.
Completing the installation
This section verifies that the RAS is fully operational.
1. Temporarily disconnect the male ends of both power cords from the power distribution strip or to a wall
outlet. Wait 30 seconds, then plug the power cords in again.
2. Verify that the green POWER LED is lit. If the POWER LED is flashing green, refer to Chapter 5, “Trou-
bleshooting and maintenance”.
3. Verify that the Link 1 Frame LED illuminates, indicating that the RAS is synchronizing with the T1/E1/
PRI signal.
4. Verify that after 5 seconds, the Link A Error LED begins flashing, indicating that the RAS is satisfied with
the quality of the T1/E1/PRI signal.
5. Verify that after 10 seconds, the Link A Error LED extinguishes, indicating that the RAS is satisfied with
the network signal and that the link is ready for use.
6. There are two LEDs on the RAS 10/100 Ethernet port: a yellow LED that indicates link status and activ-
ity, and a green LED that indicates line speed.
Verify that the yellow LED is either flashing yellow (meaning that packets are being received at the Ether-
net port) or solid yellow (meaning that the link is valid but no packets are being received).
The RAS is operational.