![Bison MMIB-20 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/bison/mmib-20/mmib-20_operators-manual_2757189008.webp)
PRE-DELIVEY INSPECTION MADE BY BISON DEALERSHIP
Once the hammer mill has been adjusted completely, check and ensure that it is ready for proper
operation prior to deliver to customer. The following checklist is a reminder of checkpoints. Verify that
each point is satisfactory and recheck once all proper adjustments have been made.
Check that the hammer mill is properly assembled.
Check that bolts, nuts and screws are tight.
Check that the screws of the wheel maces are tightened properly.
Check that all grease fittings are lubricated.
Check that the assembly: expulsion elbow-cyclone is properly assembled.
Connect the PTO y check the rotor operation. Check that the machine doesn’t vibrate excessively
nor makes strange noises.
Clean the mill and retouch where the paint is peeled or scratched.
Ensure that all labels and protective covers are properly fixed without damages.
Ensure the machine has all features required by client.
Assembly Date______________Name and Signature of Technician_______________________
INSPECTION LIST
3
Содержание MMIB-20
Страница 1: ...Models MMRB 20 MMIB 20 HAMMER MILL OPERATOR S MANUAL Part Number 4350 2130 01 MMB MMB...
Страница 2: ......
Страница 52: ...47...
Страница 66: ...NOTES 61...
Страница 67: ...NOTES 62...
Страница 68: ...NOTES 63...
Страница 69: ...NOTES 64...
Страница 70: ...PART NUMBER 4350 2130 01 2012 Tecnomec Agr cola S A de C V All Rights Reserved...
Страница 71: ......
Страница 72: ......