INSTALLATION
TO AVOID SERIOUS PERSONAL INJURY, PROPERLY INSTALL
EQUIPMENT IN ADEQUATE WORK AREA
3
•
ALWAYS
Connect to
Proper
Voltage & Phase.
•
NEVER
Operate Machine With Product Mixer Safety Cover Open or Removed or Magnetic
Interlock Switch By-Passed.
•
ALWAYS
Use Qualified Technician and Electrician for Installation.
•
ALWAYS
Install Equipment in Work Area with Adequate Light and Space Away From Children
and Visitors.
•
ONLY
Operate on a Solid, Level, Non-Skid Surface.
•
ALWAYS
Lock Machine Castors After Moving Machine to Operating Location.
•
NEVER
Bypass, Alter, or Modify This Equipment in Any Way From Its Original Condition.
•
NEVER
Operate Without all Warning Labels Attached and Owner/Operator Manual Available to
the Operator.
UNCRATING AND SET UP
1. Read this Manual thoroughly before installation and operation.
Do not
proceed with installation and
operation if you have any questions or do not understand anything in this Manual. Contact your local
Distributor, or BIRO
first
.
2. Remove all banding, shipping carton, and all equipment from inside the tub. Then take machine off
shipping pallet.
3. This machine is shipped with the adjustable legs fully retracted. The legs allow for a height adjustment
from the floor to centerline of bowl 23
9
/
16
” minimum to 33
1
/
16
” maximum.
4. This machine weighs approximately 750 pounds. To avoid accidents block up machine after raising to
desired operating height.
5. The adjustable legs can now be unbolted and lowered to the floor using the following steps.
6. Install machine on a level, non-skid surface in a well-lighted work area away from children and visitors.
7. This machine is complete except for knife and plate. There is a bowl shipping plug (cardboard)
placed in the output end of the grinding bowl to retain the grinding auger during shipment.
REMOVE
THE BOWL SHIPPING PLUG AND THE GRINDING AUGER.
8. After checking and making sure the power supply is correct, plug in your machine.
NEVER OPERATE
MACHINE WITH PRODUCT MIXER SAFETY COVER OPEN.
(Machine will not run with cover
open.)
9. Machine must be properly grounded. Use qualified electrician to install according to local building codes.
a. Unbolt leg and while holding leg turn leg adjusting stud (Item No. 54310) clockwise until castor rests
on floor.
b. Be sure bolt holes line up. Replace bolts and tighten securely.