![Bird Electronic Econoload 8730 Series Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/bird-electronic/econoload-8730-series/econoload-8730-series_instruction-book_2756581015.webp)
5
Chapter 3
Installation
This chapter provides information on site requirements, unpacking,
inspection, and preparing the Bird 8730 Series Econoload for use.
Unpacking and
Inspection
1. Carefully inspect the shipping container for signs of damage. If
damage is noticed, do not unpack the unit. Immediately notify the
shipping carrier and Bird Electronic Corporation.
2. If the container is not damaged, unpack the unit. Save the packing
materials in case the unit should need to be shipped again.
3. Inspect all of the components for visible signs of damage.
Immediately notify the shipping carrier and Bird Electronic
Corporation of equipment damage or missing parts.
DC Resistance
Before first using the load, get a resistance baseline for future
maintenance. Refer to “DC Resistance” on page 14 for instructions.
Placement
y
Do not use outdoors or in areas of condensing humidity.
y
Ventilation or buffer space is not required. The Econoload may be
placed in very small spaces.
y
The load may be mounted in any position. Rotate the load so that
the warning label is visible and the water connections are easily
accessible.
y
Access to a coolant supply or pump is required. Make sure the
coolant supply can meet the required flow rate.
y
To use the optional interlock, AC power is required.
Содержание Econoload 8730 Series
Страница 2: ...This Page Intentionally Left Blank...