background image

 

 

Manufacturer’s copy 

 
Please  send  the  filled-out  Warranty  Certificate  and  copies  of  the  Warranty  Certificate  Supplement  to  the 
manufacturer by e-mail: [email protected] or by fax: +370 5 2784915 

 

 

WARRANTY CERTIFICATE  

 
 

Product:

                         Boiler BIO20, Serial No __________________________ 

The Manufacturer:                    UAB “Biokaitra”, Laisvės pr. 3, LT-04215 Vilnius, Lithuania.  
 
 
This Warranty Certificate is adequate to the quality certificate. 
 

4.

 

WARRANTY APPLICATION TERMS 

-

 

In  case  of  sale,  the  Seller  must  familiarise  the  Buyer  with  the  warranty  application  terms,  to  confirm  the 
warranty certificate and present the service manual. 

-

 

The  manufacturer  shall  be  liable  under  the  warranty  only  if  the  failure  originates  as  a  result  of  causes 
inherent to the device. 

-

 

The boiler with fuel feeder and burner must be installed and put into operation by an organisation certified 
by the manufacturer. 

-

 

All  putting  into  operation  works  and  services  of  “Biokaitra”  boilers  shall  be  performed  by  the 
manufacturer’s authorised fitter or repair shop (all marks about the performed actions have to be included in 
the  Warranty  Certificate  Supplement).  Otherwise,  the  warranty  cases  to  be  valid  and  no  warranty-related 
claims are accepted. 

-

 

The  manufacturer  shall  have  a  right  to  choose  between  the  elimination  of  failure  and  the  replacement  of 
defected device with a technically fit one. 

-

 

The term of warranty is 36 months from the date of sale. The warranty is applied to all components of the 
boiler  except  for  the  moving  parts  (screw  conveyor,  motoreducers,  electric  motor),  controller  and  fast-
wearing elements (insulation ropes); these parts are subject to 12-month warranty from the date of sale. The 
warranty does not apply to boiler deflector! 

-

 

For  the  warranty  to  be  valid,  it  is  necessary  to  perform  a  warranty  service  after  a  year  of  operation.  Such 
inspection is performed for payment by an authorised repair shop. 

-

 

The  warranty  shall  be  valid  only  if  the  boiler’s  model  and  place  of  installation  are  entered  and  all  the 
original seals of the seller and authorised fitting company or repair shop as well as the documents certifying 
the fact of purchase are present. 

 

5.

 

THE WARRANTY SHALL NOT APPLY IN THE FOLLOWING CASES: 

 

- the boiler’s Warranty Certificate and/or documents certifying the fact of purchase are lost; 
- the requirements of the user manual are breached; 
- in case of mechanical damage caused to the boiler, bunker, burner, controller, motor, transporter and 
fan; 
- the damage results from undue connection of boiler; 
- if the system has no installed thermal regulation valve of three or four positions; 

 

6.

 

 

THE OWNER UNDERTAKES TO PAY FOR THE SPECIALIST’S VISIT IN THE FOLLOWING 

CASES: 

- the visit of the employee is not related to the failure of boiler; 
- it is related to the causes stipulated in Item 2; 
- by mutual agreement (by paying according to the price list approved by the company) for the 

specialist’s performed works of putting into operation / fitting of the heating system. 

 
I have familiarised myself with the terms and conditions of device connection and operation as well as 
warranty service. I have been informed about the loss of entitlement to warranty service in case of installation 
and operation of device without observing the requirements of this manual. 

 

Содержание BIO 20

Страница 1: ...Translation from the Lithuanian language BIO 20 STEEL PELLET BOILER WITH BURNER AND AUTOMATIC FUEL FEEDER BIO 20 POWER 20kW CONTROLLER ST 560 BOILER PASS USER MANUAL INSTALLATION USAGE AND MAINTENANCE...

Страница 2: ...rised service as soon as possible Intervention of persons without an adequate qualification may result in the damage to the boiler Use only genuine spare parts for the repair works The boiler and the...

Страница 3: ...ank should always be tightly closed Afterwards the fuel is fed to the burner via screw conveyor powered by electric motor connected with motoreducers In the burner the fuel is pushed to the top to for...

Страница 4: ...feed 6 10 mm straw wood and other agro pellets Chimney connection opening mm 150 Fuel costs kg h Q min Qn when heating pellets of the calorific value of 4 2 kWh kg 1 5 5 5 Maximum working water press...

Страница 5: ...Bio boiler profile 4 INSULATION MATERIAL CONTROL DESK DEFLECTOR INSULATION MATERIAL BURNER WATER CONTOUR FLUE BOX OF ASHES...

Страница 6: ...f the boiler The boiler shall be selected so that its heating power would meet the thermal losses of the object Boiler installation place The boiler shall be installed in a place the conditions of whi...

Страница 7: ...n liquefaction in the combustion chamber This would allow to extend the period of use of boiler and to improve its effectiveness For proper adjustment of properly fed and return temperature it is reco...

Страница 8: ...should be checked ATTENTION The works of boiler automation equipment can be performed by an installer who has a respective qualification Complete information about the settings of automation equipment...

Страница 9: ...power supply and avoid its disconnection III How to use the controller Phases of use The user shall configure special CH boiler operation phases Ignition and extinguishing the multi stage process as d...

Страница 10: ...erval 40 When the pre set temperature is reached the controller functions according to the 30 modulation of the stopping mode parameter The user defines the operation duration the feeder activation fr...

Страница 11: ...u When the extinguishing is activated the heater and the fan are deactivated IV Controller s functions Main Menu Due to various functions performed by the controller the menu is classified into the ma...

Страница 12: ...This option is used to pre set CH boiler temperature The setting interval reaches 65O C to 80O C factory setting CH boiler manufacturer can change the settings interval V c 2 CH boiler hysteresis Thi...

Страница 13: ...es 30 V e 1 Feeding time This parameter defines the feeder operation time having selected the specific modulation stage V e 2 Temporary suspension of feed This parameter defines the duration of tempor...

Страница 14: ...e in the main screen you will see the operating temperature deviation value below the pre set CH temperature contrary than with the advance setting button which shows to the user that this function ha...

Страница 15: ...cessary set the current time and day of the week in technical maintenance menu Time settings Remove This function allows the user to eliminate all weekly control settings V h 2 Weekly control of DHW b...

Страница 16: ...70 C Piping reinforcement and technological DHW system design should meet the requirements DHW disinfection is aimed at removing Legionella pneumophila bacteria that weakens the immunity system Such...

Страница 17: ...l controller functions such as CH boiler parameters additional valves additional pumps etc It also permits the user to achieve expanded settings of basic functions e g Parameters of installed valves B...

Страница 18: ...CH pump is used as amortisation equipment with two sensors top C1 and bottom C2 The pump remains connected until the pre set temperature bottom of the buffer is reached When the temperature drops bel...

Страница 19: ...ected Pre set valve temperature Opening time Type of valve CH floor Room regulator Control without room regulator RS regulator reduction RS regulator proportional Standard regulator Room reg temperatu...

Страница 20: ...ves it is necessary to register the valve by entering the number of module indicated on the module frame e g ST 431N in order to configure its parameters VI c 2 Valve activation deactivation This func...

Страница 21: ...enu when this preparation is selected By activating this room temperature regulator you can monitor the current temperature of CH boiler water tank and valves The regulator must be connected to ST 650...

Страница 22: ...external sensor shall be protected from sunlight or the effect of weather conditions should be removed When installed in a necessary place it is necessary to turn on weather control function in contr...

Страница 23: ...necessary to change the power cable It is enough to change the opening direction of this parameter LEFT or RIGHT VI c 12 Single stroke It is a maximum single stroke closing and opening for one tempera...

Страница 24: ...en the base valve is selected This function defines the maximum valve sensor temperature if the base sensor is selected When this temperature is reached the alarm is activated and the valve is closed...

Страница 25: ...activated It is deactivated when the temperature drops down to 35 C o Sensor option It allows the user to choose which sensor should provide data to activate the additional CH pump VI d 2 DHW pump Wh...

Страница 26: ...g between CH boiler and DHW collection tanks It is necessary to configure the following parameters for proper functioning of the circulator pump o Operation time This parameter defines pump operation...

Страница 27: ...s function is used to set the current date VI g Fuel level calibration After the proper performance of fuel level calibration the user can review the current fuel level in the controller s screen Duri...

Страница 28: ...tivated the module and selected DHCP option the controller automatically sends such parameters to the IP address IP mask lock address and DNS address from the local network If any problems arise when...

Страница 29: ...temperature increases further the alarm is activated under the 85O C temperature It usually happens when the water boiler or the pump are damaged or in case of improper installation of the sensor Whe...

Страница 30: ...on W 10 3 Ambient temperature OC 10 50 4 Feeder output load A 2 5 Pump output load A 0 5 6 Fan output load A 0 6 7 Temperature measurement interval O C 0 90 8 Measurement accuracy O C 1 9 Temperature...

Страница 31: ...s regulated devices and sensors 1 Pellet boiler radiators boiler floor heating 30 T4 FAUCET PUMP DIRT COLLECTOR 3 WAY VALVE NON RETURN VALVE SAFETY GROUP EXPANSION VESSEL Automatic mixing unit LK ARM...

Страница 32: ...in volatile ashes or soot on their internal walls For this reason it is necessary periodically but at least once in two weeks to clean the boiler and the burner with the scraper and brush Before clean...

Страница 33: ...ust the closing and hinges or to take out the rope from the grooves of doors to rotate by 90 and to reinsert to the groove of the doors It is only a temporary solution therefore it may be necessary to...

Страница 34: ...erating water temperature TS 85oC Maximum permissible operating pressure PS 2 bar Water tank 84l Required electric power 200W Electric connection 50Hz 220V Date of manufacture 2013 03 25 Boiler class...

Страница 35: ...ith the following provisions and the requirements of standards Pressure vessels technical regulation directive PED 97 23 EC Machine directive 2006 42 EC Directive on Electrical equipment designed for...

Страница 36: ...ontroller and fast wearing elements insulation ropes these parts are subject to 12 month warranty from the date of sale For the warranty to be valid it is necessary to perform a warranty service after...

Страница 37: ...ontroller model and serial number ___________________________ Date of the original putting into operation _______________________________________ System installer person in charge of putting into oper...

Страница 38: ...ctric motor controller and fast wearing elements insulation ropes these parts are subject to 12 month warranty from the date of sale The warranty does not apply to boiler deflector For the warranty to...

Страница 39: ...15 Warranty Certificate Supplement Boiler model _____________________________________________ Controller model and serial number ___________________________ Date of the original putting into operation...

Страница 40: ...______ Company that performed installation Fitter s family name __________________________________________________________ Place of installation address _______________________________________________...

Страница 41: ...__________________________________ Considering that it is related to the boiler s defects I hereby ask to send your representatives for the inspection of connected boiler determination and elimination...

Страница 42: ..._________________________________________________________ _______________________________________________________________________________________ ______________________________________________________...

Отзывы: