background image

 

TECHNICAL DATA

 

 

No 

Specification 

Unit 

 

Supply voltage 

230V/50Hz +/-10% 

Power consumption 

10 

Ambient temperature 

O

10÷50 

Feeder output load  

Pump output load 

0.5 

Fan output load 

0.6 

Temperature measurement interval 

O

0÷90 

Measurement accuracy 

O

Temperature parameter interval 

O

45÷90 

10 

Sensor thermal resistance 

O

-25÷99 

11 

Fuse 

2x6.3 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

29 

Содержание BIO 20

Страница 1: ...Translation from the Lithuanian language BIO 20 STEEL PELLET BOILER WITH BURNER AND AUTOMATIC FUEL FEEDER BIO 20 POWER 20kW CONTROLLER ST 560 BOILER PASS USER MANUAL INSTALLATION USAGE AND MAINTENANCE...

Страница 2: ...rised service as soon as possible Intervention of persons without an adequate qualification may result in the damage to the boiler Use only genuine spare parts for the repair works The boiler and the...

Страница 3: ...ank should always be tightly closed Afterwards the fuel is fed to the burner via screw conveyor powered by electric motor connected with motoreducers In the burner the fuel is pushed to the top to for...

Страница 4: ...feed 6 10 mm straw wood and other agro pellets Chimney connection opening mm 150 Fuel costs kg h Q min Qn when heating pellets of the calorific value of 4 2 kWh kg 1 5 5 5 Maximum working water press...

Страница 5: ...Bio boiler profile 4 INSULATION MATERIAL CONTROL DESK DEFLECTOR INSULATION MATERIAL BURNER WATER CONTOUR FLUE BOX OF ASHES...

Страница 6: ...f the boiler The boiler shall be selected so that its heating power would meet the thermal losses of the object Boiler installation place The boiler shall be installed in a place the conditions of whi...

Страница 7: ...n liquefaction in the combustion chamber This would allow to extend the period of use of boiler and to improve its effectiveness For proper adjustment of properly fed and return temperature it is reco...

Страница 8: ...should be checked ATTENTION The works of boiler automation equipment can be performed by an installer who has a respective qualification Complete information about the settings of automation equipment...

Страница 9: ...power supply and avoid its disconnection III How to use the controller Phases of use The user shall configure special CH boiler operation phases Ignition and extinguishing the multi stage process as d...

Страница 10: ...erval 40 When the pre set temperature is reached the controller functions according to the 30 modulation of the stopping mode parameter The user defines the operation duration the feeder activation fr...

Страница 11: ...u When the extinguishing is activated the heater and the fan are deactivated IV Controller s functions Main Menu Due to various functions performed by the controller the menu is classified into the ma...

Страница 12: ...This option is used to pre set CH boiler temperature The setting interval reaches 65O C to 80O C factory setting CH boiler manufacturer can change the settings interval V c 2 CH boiler hysteresis Thi...

Страница 13: ...es 30 V e 1 Feeding time This parameter defines the feeder operation time having selected the specific modulation stage V e 2 Temporary suspension of feed This parameter defines the duration of tempor...

Страница 14: ...e in the main screen you will see the operating temperature deviation value below the pre set CH temperature contrary than with the advance setting button which shows to the user that this function ha...

Страница 15: ...cessary set the current time and day of the week in technical maintenance menu Time settings Remove This function allows the user to eliminate all weekly control settings V h 2 Weekly control of DHW b...

Страница 16: ...70 C Piping reinforcement and technological DHW system design should meet the requirements DHW disinfection is aimed at removing Legionella pneumophila bacteria that weakens the immunity system Such...

Страница 17: ...l controller functions such as CH boiler parameters additional valves additional pumps etc It also permits the user to achieve expanded settings of basic functions e g Parameters of installed valves B...

Страница 18: ...CH pump is used as amortisation equipment with two sensors top C1 and bottom C2 The pump remains connected until the pre set temperature bottom of the buffer is reached When the temperature drops bel...

Страница 19: ...ected Pre set valve temperature Opening time Type of valve CH floor Room regulator Control without room regulator RS regulator reduction RS regulator proportional Standard regulator Room reg temperatu...

Страница 20: ...ves it is necessary to register the valve by entering the number of module indicated on the module frame e g ST 431N in order to configure its parameters VI c 2 Valve activation deactivation This func...

Страница 21: ...enu when this preparation is selected By activating this room temperature regulator you can monitor the current temperature of CH boiler water tank and valves The regulator must be connected to ST 650...

Страница 22: ...external sensor shall be protected from sunlight or the effect of weather conditions should be removed When installed in a necessary place it is necessary to turn on weather control function in contr...

Страница 23: ...necessary to change the power cable It is enough to change the opening direction of this parameter LEFT or RIGHT VI c 12 Single stroke It is a maximum single stroke closing and opening for one tempera...

Страница 24: ...en the base valve is selected This function defines the maximum valve sensor temperature if the base sensor is selected When this temperature is reached the alarm is activated and the valve is closed...

Страница 25: ...activated It is deactivated when the temperature drops down to 35 C o Sensor option It allows the user to choose which sensor should provide data to activate the additional CH pump VI d 2 DHW pump Wh...

Страница 26: ...g between CH boiler and DHW collection tanks It is necessary to configure the following parameters for proper functioning of the circulator pump o Operation time This parameter defines pump operation...

Страница 27: ...s function is used to set the current date VI g Fuel level calibration After the proper performance of fuel level calibration the user can review the current fuel level in the controller s screen Duri...

Страница 28: ...tivated the module and selected DHCP option the controller automatically sends such parameters to the IP address IP mask lock address and DNS address from the local network If any problems arise when...

Страница 29: ...temperature increases further the alarm is activated under the 85O C temperature It usually happens when the water boiler or the pump are damaged or in case of improper installation of the sensor Whe...

Страница 30: ...on W 10 3 Ambient temperature OC 10 50 4 Feeder output load A 2 5 Pump output load A 0 5 6 Fan output load A 0 6 7 Temperature measurement interval O C 0 90 8 Measurement accuracy O C 1 9 Temperature...

Страница 31: ...s regulated devices and sensors 1 Pellet boiler radiators boiler floor heating 30 T4 FAUCET PUMP DIRT COLLECTOR 3 WAY VALVE NON RETURN VALVE SAFETY GROUP EXPANSION VESSEL Automatic mixing unit LK ARM...

Страница 32: ...in volatile ashes or soot on their internal walls For this reason it is necessary periodically but at least once in two weeks to clean the boiler and the burner with the scraper and brush Before clean...

Страница 33: ...ust the closing and hinges or to take out the rope from the grooves of doors to rotate by 90 and to reinsert to the groove of the doors It is only a temporary solution therefore it may be necessary to...

Страница 34: ...erating water temperature TS 85oC Maximum permissible operating pressure PS 2 bar Water tank 84l Required electric power 200W Electric connection 50Hz 220V Date of manufacture 2013 03 25 Boiler class...

Страница 35: ...ith the following provisions and the requirements of standards Pressure vessels technical regulation directive PED 97 23 EC Machine directive 2006 42 EC Directive on Electrical equipment designed for...

Страница 36: ...ontroller and fast wearing elements insulation ropes these parts are subject to 12 month warranty from the date of sale For the warranty to be valid it is necessary to perform a warranty service after...

Страница 37: ...ontroller model and serial number ___________________________ Date of the original putting into operation _______________________________________ System installer person in charge of putting into oper...

Страница 38: ...ctric motor controller and fast wearing elements insulation ropes these parts are subject to 12 month warranty from the date of sale The warranty does not apply to boiler deflector For the warranty to...

Страница 39: ...15 Warranty Certificate Supplement Boiler model _____________________________________________ Controller model and serial number ___________________________ Date of the original putting into operation...

Страница 40: ...______ Company that performed installation Fitter s family name __________________________________________________________ Place of installation address _______________________________________________...

Страница 41: ...__________________________________ Considering that it is related to the boiler s defects I hereby ask to send your representatives for the inspection of connected boiler determination and elimination...

Страница 42: ..._________________________________________________________ _______________________________________________________________________________________ ______________________________________________________...

Отзывы: