Not for
Reproduction
28
billygoat.com
Maintenance Procedures
Impeller Removal and Inspection
Use this procedure to inspect or replace a broken im-
peller.
1. Park machine on a level surface. Remove key.
2. Allow machine to cool. Never perform work on a
hot machine.
3. Take off the front safety cover by removing the six
5/16-18 x 3/4 front cover bolts.
Front Cover
4. Remove the 7/16-20 x 1-1/2 impeller bolt.
5. Inspect impeller for cracks or damage. Replace
the impeller if any damage is found. Contact your
local dealer for original equipment manufacturer
for replacement parts.
6. Replace 1/4 x 1/4 key if there is any damage to
the key.
7. When re-installing the impeller bolt the threads
must be clean of all oil, must use red Loctite and
torque the impeller bolt to
80 ft-lbs.
8. Replace safety cover in reverse order.
Caution
should be used when removing impeller, it is
heavy and there is not enough room for your
fi
ngers
in the opening with the impeller, hold onto the impeller
by the
fi
ns using gloves to remove from the housing.
Changing Drive Belt
1. Park machine on a level surface. Remove key.
2. Allow machine to cool. Never perform work on a
hot machine.
3. Remove belt guard and two 5/16-18
fl
ange nuts.
4. Use 3/4 wrench on idler pulley for leverage to
loosen belt and remove belt from hydro pulley.
Remove wrench.
5. Unthread the belt from the pulleys and discard.
Idler Pulley
Figure 1
Содержание Hurricane Z3000
Страница 2: ...N o t f o r R e p r o d u c t i o n billygoat com ...
Страница 45: ...N o t f o r R e p r o d u c t i o n Notes ...
Страница 46: ...N o t f o r R e p r o d u c t i o n Notes ...
Страница 47: ...N o t f o r R e p r o d u c t i o n Notes ...
Страница 48: ...N o t f o r R e p r o d u c t i o n ...