BHI
Best Hammer Industries
- 21 -
After the carrier is warmed up, suspend the hammer in the air (with the tool
extended) to activate the automatic stop. Activate the control to circulate the oil and
warm the hammer. Warm the tool bit by operating at slow speeds for five to ten minutes.
During extremely low temperatures, store the tool inside.
6) Do Not Allow Cylinders To Reach The End Of Their Stroke
They will not endure the hammer vibrations in this position.
Содержание HydroRam HK580S
Страница 1: ...BHI HydroRam Hydraulic Hammer HK580S Operation Manual Parts List...
Страница 3: ......
Страница 5: ......
Страница 8: ...BHI Best Hammer Industries 3...
Страница 19: ...BHI Best Hammer Industries 14 3 External Dimension Power cell and Silence Bracket...
Страница 43: ...BHI Best Hammer Industries 38 AUTO LUBE KIT OPTION...
Страница 46: ...BHI BHI HydroRam Hydraulic Hammer HK580S Parts List...
Страница 47: ...BHI Best Hammer Industries 2 HK580S POWER CELL...
Страница 52: ...BHI Best Hammer Industries 7 HK580S BRACKET...