BHI
Best Hammer Industries
- 23 -
3. Operator's routine maintenance
1) Lubrication
Grease the tool and bushings every two to
four hours of operation, more than often in
dusty or severe conditions, with five to ten
pumps of good quality, high temperature
grease.
2) Inspection Points:
(1) Visual Inspection.
Check welds for possible cracks on the
bracket cap, rear, tool and boom.
(2) Check for loose nuts and bolts.
(1) In the bracket cap
(2) In the charging valve
(3) In the accumulator
(4) In the side plates
(5) In the tool holder pin
(3) The tool retainer pins
When replacing tool retainer pins always replace
them in sets and rotate then equally.
(4) Excessive oil leakage down the tool
This is an indication of worn or
damaged seals that need to be replaced.
Содержание HydroRam HK580S
Страница 1: ...BHI HydroRam Hydraulic Hammer HK580S Operation Manual Parts List...
Страница 3: ......
Страница 5: ......
Страница 8: ...BHI Best Hammer Industries 3...
Страница 19: ...BHI Best Hammer Industries 14 3 External Dimension Power cell and Silence Bracket...
Страница 43: ...BHI Best Hammer Industries 38 AUTO LUBE KIT OPTION...
Страница 46: ...BHI BHI HydroRam Hydraulic Hammer HK580S Parts List...
Страница 47: ...BHI Best Hammer Industries 2 HK580S POWER CELL...
Страница 52: ...BHI Best Hammer Industries 7 HK580S BRACKET...