background image

4

1.5 Diagram of Components and Control Buttons

The Gpro P1 is equipped with a display screen and a control button on both the left and right 

sides. And the design of left and right sides are perfectly symmetrical, which enables either left- 

hand or right-hand operation;

1. “ON/OFF” button 

2. Heating button

3. Heat insulation sleeve 

4. Tip

5. Connecting hole for power adapter 

6. Temperature

7. Battery level 

8. Charging base

9. Battery cartridge 

10. Charging indicator

11. Power adapter plug 

12. Power adapter

Содержание GPRO P1

Страница 1: ...Gutta Percha Obturation System Instruction for Use...

Страница 2: ...k involved safety requirements are classed under the following indications Danger Always refer to personal injury Warning Refer to possible damage to property Table of Contents 1 Introduction 3 2 Inst...

Страница 3: ...nded Use It is used to heat cut soften and downpack gutta percha to obturate root canals in endodontic treatment 1 3 Contraindications Patient allergic to known natural latex and metals such as stainl...

Страница 4: ...And the design of left and right sides are perfectly symmetrical which enables either left hand or right hand operation 1 ON OFF button 2 Heating button 3 Heat insulation sleeve 4 Tip 5 Connecting ho...

Страница 5: ...e first use Warning Do not drain battery Always charge to full to maintain battery life Recharge battery if the device has not been used for more than 1 month 2 Installation 2 1 Charge device 1 Instal...

Страница 6: ...nto heating chamber completely Note To remove the tip hold near the turn of the tip and gently pull out Warning Needle remains hot after use Wait till display 0 C Warning Before each use clean disinfe...

Страница 7: ...release on off button to select the temperature setting Temperature setting cycles as shown below Note The display shows 0 C when no button is pressed If the tip heats up or cools down the display sho...

Страница 8: ...oint 4 7 mm short of the working length Move and set the endo stop accordingly 6 Insert the selected master Gutta Percha cone that is coated with sealer 7 Insert GPro P1 tip in the orifice of the cana...

Страница 9: ...ower adapter Optional preset temperatures 150 C 180 C 200 C 230 C Time consumption for charging About 2 5h First charging needs 3 h Power supply Input AC100V 240V 50 60Hz 800mA Output DC15V 1 6A Batte...

Страница 10: ...tch Ordinary equipment Used indoor only Device complies with WEEE directive Can be autoclaved Keep dry Handle with care Recovery Attention Please refer to the accompanying documents Humidity limit for...

Страница 11: ...should be equipped with adequate protection such as goggles mask etc to prevent cross infection 7 The product should be in strict accordance with relevant operation specifications of medical authority...

Страница 12: ...le and diffluent solvents for cleaning which will damage the surface of the device or cause the markings on the machine to fade 8 2 Daily maintenance 1 When the device is not used please turn off the...

Страница 13: ...s the interior of the heating chamber is fixed by the cooling of the gutta percha 1 Power on and set the temperature to 200 C After the temperature reaches the set value pull out the pushing ram back...

Страница 14: ...only to the first retail purchaser of a product and is not transferable or assignable Replacement components or products may be used and or refurbished components or products provided they are of lik...

Страница 15: ...arranty is the repair or replacement of defective parts Beyes shall not be liable for and hereby disclaims any direct special indirect incidental exemplary or consequential damages or delays including...

Страница 16: ...aplein 10 Ie Verd 2595AA The Hague Netherlands Tel 31645171879 English 31626669008 Dutch Email info beyes ca Website www beyes ca Printed in Canada ENI036 Rev 1 12 03 21 Federal law restricts this dev...

Отзывы: