2
OPERA
TION
105
GB
RECOMMENDED LUBRICANTS
To maximize the vehicle’s performance and ensure many years of trouble-free opera-
tion, we recommend using the following products:
Note
It is essential that all renewals should be performed with the products listed in the
table above.
RUNNING-IN
The running-in period lasts approximately 15 hours, during which it is advisable to:
1 During the first 3 hours of operation the engine should only be used to approxi-
mately 50 percent of its power. In addition, the engine speed should not exceed
7,000 rpm.
2 For the next 12 hours of operation the engine should only be used to about 75
percent of its power.
3 Use the vehicle after properly warming up the engine.
4 Avoid travelling at constant speed (changing the speed causes the different com-
ponents to bed in evenly and more quickly).
WARNING
After the first 3 hours or 20 litres of petrol change the engine oil.
•
Always use high-octane unleaded petrol.
•
After using the vehicle on rough ground for the first time, carefully
check the
tightening of all nuts and bolts
.
PRODUCT TYPE
SPECIFICATIONS
ENGINE OIL
BARDAHL XTM15W 50
BRAKE OIL
BARDAHL BRAKE FLUID DOT4
FORK OIL
EB-H16 SAE 7,5
TIE ROD GREASE
BARDAHL MPG2
CLUTCH OIL
ARAL VITAM LS (mineral oil)
LIQUID COOLANT
IP ECOBLU
Содержание RR 4T-250
Страница 1: ...WORKSHOP MANUAL RR 4T 250 400 450 525 ...
Страница 98: ...3 7 Carburettor Release 00 Date 02 2005 CARBURETTOR KEIHIN FCR M X 39 ...
Страница 109: ...3 8 Front suspension wheel Release 00 Date 02 2005 Four Stroke l ...
Страница 165: ......
Страница 199: ......
Страница 212: ...6 TROUBLESHOOTING 149 GB CONTENTS CHARTER 6 TROUBLESHOOTING INDEX ...
Страница 215: ...152 ...