![Best Barns Glenwood II Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/best-barns/glenwood-ii/glenwood-ii_assembly-book_2740073009.webp)
Step 8
Install Loft Floor
Step 9A
Install Loft Floor Sheathing
Before installing floor sheathing consider where to locate the 2' x 4' access
opening. The detail below shows one possibility. Regardless of desired
layout it is important to install sheathing staggered when possible.
Important: Before securing the 2x4 floor joists make sure the side walls are plumb. The
building width should be 12'-0" measuring from the outside of the 2x4 tie plates.
Cut (11) eleven 2x4-12' boards to a length of 137" and install
in the metal hangers. Use 1-1/2" hanger nails.
4' x 8'
Suggested 2'x4 Opening Location
4' x 8'
4' x 8'
2' x 4'
4' x 8'
4' x 4'
Cut a 4' x 8'
in half
4' x 4'
4' x 4'
Cut a 4' x 8'
in half
Содержание Glenwood II
Страница 24: ......