X
X
X
X
X
X
X
X
X
X
Cut Edge Flush
Tongue Edge
Flush
Cut Siding Flush
Step 4
Assemble Front Wall Frame
1.
Cut (2) two 2x4-12' boards (one will be treated) to a length of 144" for wall plates. Position
the boards together and indicate with 'X' Marks where the wall studs will be located.
96" Finished Door Opening
21"
21"
Treated Bottom Plate
3.
Cut (2) pre-cut studs to a length
of 82" and install as header
supports where shown. Nail to
stud using 10d sinkers.
4.
Install the door header on the
header supports. Nail to the wall
stud with 10d sinkers.
5.
Remove a 2x4 screwed to the
pallet. Measure space between
header and top plate. Cut (5)
five pieces to this length. Evenly
space pieces and nail through
top plate and toenail to header.
Use 10d sinkers.
6.
Cut a siding panel in half
length-ways. Select the panel
with the 'Tongue' Edge. Save
the other panel for step 9 below.
82" Header Support
nail
nail
2x4 Block
Centered
2x8 Door Header
2.
Install (4) four pre-cut wall studs between the wall plates where shown. Nail top plate to studs
using 10d sinkers. Nail bottom plate to studs using 16d galv. nails.
96" Door Opening
9.
Install remaining panel with LAP
edge flush with door opening.
8.
Install (2) two 20"x48" siding panels above the door
opening. Cut siding flush with the bottom of the 2x4.
Siding Extends 3/4" Below Plate
7.
Install panel with the 'Tongue' edge flush with door opening and cut edge flush with end of
wall. Siding should extend 3/4" below bottom plate. Use 6d galv. nails.
Содержание Glenwood II
Страница 24: ......