No Diving or Jumping.
Observe all Safety Rules.
a. Hook a buttress top plate (key 17)
over the top edge of the pool wall
(key 5). Place the buttress top plate
down over the top of the upright (key
9) with the tabs on the
outside
of the
upright. Make sure the upright is
straight up and down.
b. Line up the screw holes and fasten
with one self-tapping screw on each
side (key 3).
c. Repeat step (a and b) for the remain-
ing buttress top plates.
d. Install all the side rails between the
buttresses. Refer to the chart on page
2-7 for the correct rail to use.
Impor-
tant:
to install the side rails between
the buttresses it maybe necessary to
slightly pull one upright away from
the other to install the side rail. Make
sure the verticals are aligned straight
up and down after installation of the
side rails. (
Note:
the 12' x 18' pool does
not have side rails).
e. Line up the bottom of one vertical column (key 1)
with the tab on one base plate (key 14). The tab
must be on the
outside
of the vertical column.
f. Line up the screw holes and fasten with one self-
tapping screw (key 3).
g. Repeat steps (e and f) for the remaining vertical
columns.
h. Install the four transition
rails. Refer to the chart on
page 2-7 for the correct rail
to use. Insert one end of a
transition rail into a top con-
nector (key 4). Insert the other
end of the rail into a buttress
top plate.
Important the top
connectors are painted
steel parts.
Line up the hole in the tab of the top connector with the
screw hole near the top of the vertical column. The tab must be on
the
outside
of the vertical column. Secure the top connector with a
self tapping screw.
2-8
20
17
9
22
6
4
1
19
17
9
3
3
5
3
14
1
21