![Berthold LB 134 Скачать руководство пользователя страница 116](http://html1.mh-extra.com/html/berthold/lb-134/lb-134_user-manual_2739260116.webp)
LB 134
7. Probes for the LB 134
106
b
) You may also proceed in reverse order: First, put the front
side of the probe against the pivots and then push the rear
side down against the tapered bar.
Figure 7.22: Inserting the Tritium probe
Figure 7.22: Closing the gas valve when inserting the probe
7.9.6 Commissioning of Tritium Probe
Sdfsf
1. Remove the transport packaging and check the equip-
ment parts for completeness and integrity.
Installing the P10 gas cylinder and double pressure reduc-
er
2. Place the P10 gas cylinder (
closed!
) in the holding de-
vice on the trolley and secure it with both straps.
3. Screw the
closed
double pressure reducer onto the
gas cylinder by placing the sleeve nut onto the screw
Содержание LB 134
Страница 1: ...LB 134 Universal Monitor II Program version V 1 00 and higher ID No 62688BA2 Rev No 02 08 04 2016...
Страница 2: ......
Страница 6: ...LB 134 Content IV...
Страница 8: ...LB 134 Working with the User s Manual VI...
Страница 10: ...LB 134 Safety Instructions VIII...
Страница 34: ...LB 134 2 System Description 24 Figure 2 9 LB 134 with wall bracket...