55
Commisioning
GB
Measuring the blind/shutter and slat running times
The blind/shutter running time is important for positioning and
scene moves. With Venetian blinds, the slat adjusting time is for
technical reasons part of the overall running time of blinds/shut-
ters. The opening angle of the slats is therefore defined as the
running time required between the ‚open‘ and ‚closed‘ positions.
The upward move is generally longer than the downward move and
is accounted for as running time prolongation in percent.
Measure the ‚up‘ and ‚down‘ running times of the blind/shutter.
Measure the slat adjusting time between ‚open‘ and ‚closed‘.
Enter the measured values into the parameter settings list (down-
ward travel in seconds and running time extension in percent).
In case of automatic running time detection no measurement of
the blind/shutter running times is required.
Automatic measurement of the slat adjusting time is not
possible.
Loading the address and the application software
Switch on the bus voltage.
Allocate the physical address and load the application software
into the device.
Note the physical address on the device label.
Содержание 7531 40 18
Страница 6: ...6 Bedienung D 2...
Страница 14: ...14 Anschluss D 3...
Страница 38: ...38 GB Operation 2...
Страница 46: ...46 GB Connection 3...
Страница 70: ...70 Bediening NL 2...
Страница 78: ...78 Aansluiting NL 3...
Страница 97: ...97 Notes...
Страница 98: ...98 Notes...
Страница 99: ...99 Notes...