Electrical Installation
44
2-20
Connect the assembled connector to the
existing connector on the Terra Power
switch.
Optional Phoenix System Lockout
Beginning 6/26/2017
Connecting the 12 volts to terminal 2 on the
4 pin connector will disable the Phoenix
system. Example: this can be an input from
a park brake or ignition switch to disable the
system while vehicle is being driven. This
connector is provided with your kit.
Complete Electrical Wiring
Recheck and tighten all battery and
separator connections. Zip tie the cables
where necessary. Your wiring should match
the diagram on page 5-1.
39
Electrical Installation
Содержание NITE Phoenix T2000
Страница 8: ...8 1 6 Before You Start EPA ...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Страница 24: ...24 Section 2 Electrical Installation ...
Страница 42: ...42 2 18 Electrical Installation ...
Страница 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Страница 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Страница 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Страница 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Страница 65: ...65 Section 5 Operating Instructions ...
Страница 69: ...69 Section 6 Battery Management System BMS Installation ...
Страница 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Страница 71: ...71 6 2 Battery Management ...
Страница 72: ...72 6 3 Battery Management ...