31
2-7
Electrical Installation
Electrical Installation
CAUTION:
Battery management device
must be positioned on top of the battery
where it is supported. The cork gasket
should be installed to help prevent
vibrations.
Install Battery Management System
Lug with (open hole) mounts on the battery
negative post. Grounds for the Phoenix and
auxiliary heater will connect to the threaded
stud post along with the ground cable from
the truck starting batteries. This device is
monitoring amps drawn from the batteries
as well as the charging current to the
batteries. It also controls the separator
solenoid.
Connect Power Cables from Phoenix
Unit to the NITE Batteries
Connect positive cable from the
NITE
Phoenix
unit to the 100 amp mega fuse in
the fuse holder. Kit contains 2 lugs with
5/16 diameter holes. Make a short (jumper)
auxiliary battery positive terminal of the
NITE Batteries
. Trim end of lug if necessary
to prevent damage to fuse. Connect the
negative cable from the
NITE Phoenix
unit
to the negative threaded stud (C) on the
BMS.
DO NOT CONNECT POSITIVE TRUCK
BATTERY CABLE YET. WE WILL
CONNECT THIS CABLE ONCE FINISHED.
Battery Management System
Installed
5/16 lugs
C
7
8
Содержание NITE Phoenix T2000
Страница 8: ...8 1 6 Before You Start EPA ...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View ...
Страница 24: ...24 Section 2 Electrical Installation ...
Страница 42: ...42 2 18 Electrical Installation ...
Страница 46: ...46 Section 3 ESPAR Fuel Operated Heater Installation ...
Страница 60: ...60 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams ...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams ...
Страница 62: ...62 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams ...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams ...
Страница 64: ...64 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams ...
Страница 65: ...65 Section 5 Operating Instructions ...
Страница 69: ...69 Section 6 Battery Management System BMS Installation ...
Страница 70: ...70 6 1 Bergstrom NITE System BMS 100 Installation Battery Management ...
Страница 71: ...71 6 2 Battery Management ...
Страница 72: ...72 6 3 Battery Management ...