Commissioning and troubleshooting
If you are using the control unit for the first time, please check the following points again before switching it on:
Are all terminal blocks correctly aligned in the slots?
Is the power supply (24 to 55V=) correctly connected (terminal X1 on top
and
terminal V on the right)?
If the supply voltage is higher than 30V, jumper JP3 must be set to position 13-14 (▪ ▪ ▬ ▪, limit switch supply 12V).
Is the emergency stop switch connected? For test purposes only, a jumper may be connected between pins 5 and 6 of X2
as an alternative. An emergency stop switch is legally required on a machine.
If these requirements are met, you can establish the connection to the PC, switch on the supply voltage and start the control
software. After activating the software and successful connection in the Configuration->Hardware dialog, the status of the LED
lights should be as follows:
the two green LEDs "Power" and "Ready" must be lit,
at the network socket the LED "Network Carrier" (green) must light up, and the LED "Network traffic" (yellow) must
blink evenly and fast
the two red LEDs "Drive Fault" and "E-Stop" must be off
the two yellow LEDs relay 1 and relay 2 must be off.
If this is not the case, please refer to the chapter "Troubleshooting" below. If everything is in order, you can now check the
movement of the motors and the function of the relays and switches.