Gennaker system connected parts (from left to right and from top to bottom):
-
1x snuffer bag
-
2x gennaker sheet (grey-blue, tapered)
-
2 m 1,5 mm Dyneema rope for snuffer fixation on the ring
-
2 m 3 mm nylon rope for snuffer cabin fixation
-
1 m 3 mm nylon rope for snuffer aft fixation
-
1x Ronstan RF25100 block with lashing rope
-
2x Ronstan RF56100 block with ratchet
-
2x Ronatan RF45101 block
2.4. Shrouds and halyards
Содержание First 18
Страница 5: ......
Страница 8: ...To change the code on your unique 4 digit number please follow the instructions of the lock supplier ...
Страница 20: ...3 2 Vang double block assembly Remove the shackle from the Ronstan RF20202 double block ...
Страница 34: ......
Страница 43: ...6 Mainsail controls 6 1 Boom assembly Fit the boom on the gooseneck and insert the bolt ...
Страница 46: ......
Страница 56: ...Finish the lashing with a series of half hitches and melt the securing overhand knot at the end ...
Страница 85: ......
Страница 87: ...Hoist the jib completely while closing the pocket ...
Страница 89: ...Tension the jib luff and fold the halyard at the end of the zip pocket Tie a simple single loop on the halyard ...
Страница 93: ...Tension the cunningham For a start apply medium tension better less than too much ...
Страница 104: ...Round the velcro around the boom Leave space for one finger in between the velcro and the boom ...
Страница 108: ...tack of the mainsail will be straight without folds ...