Connecting the Hydraulic Lines
Some of the Hydraulic Lines were put into place much earlier in the installation. It is now time to finish
routing and installing them.
This section covers:
•
Connecting the Elbow Fitting that connects to the Power Unit.
•
Routing the Short Hydraulic Line from the Power Unit to the Tee Hydraulic Fitting.
•
Routing the Long Hydraulic Line over the Overhead Assembly and to its connection point on the
Powerside Post.
•
Connecting the Very Short Hydraulic Line,
for Wide Configurations only
.
All XPR-10 Series Lifts use either three or four Hydraulic Lines:
•
One Short Hydraulic Line (A)
. Goes from the Power Unit up to the Tee Hydraulic Fitting on
the Powerside Post; connects on the outside of the Post. Not yet installed.
•
One Medium Hydraulic Line (B)
. Goes from the Tee Fitting on the inside of the Powerside
Post down to the bottom of the Powerside Hydraulic Cylinder. Already installed.
•
One Long Hydraulic Line (C)
. Goes from the inside of the Powerside Post above the Tee
Fitting, over the Overhead Assembly, and down the Offside Post to the bottom of the Offside
Hydraulic Cylinder. Already connected to the Hydraulic Cylinder, but not yet routed over the
Overhead Assembly to the Tee Fitting.
•
One Very Short Hydraulic Line (D)
. Goes on the inside of the Powerside Post, connecting to
the Tee Fitting and then to the long Hydraulic Line;
for Wide Configurations only
. Without this
extension, the Long Hydraulic Line would not be long enough for Wide Configurations. This Line is
~13" for Symmetric Lifts, ~8" for Asymmetric Lifts.
Not used for Narrow Configurations
. Not yet
installed.
All Hydraulic Lines and Hydraulic Fitting locations are shown in the drawing below.
•
Содержание XPR-10 Series
Страница 9: ...XPR 10 Series Two Post Lifts 9 P N 5900951 Rev D May 2019 Specifications ...
Страница 77: ...XPR 10 Series Two Post Lifts 77 P N 5900951 Rev D May 2019 Labels ...
Страница 78: ...XPR 10 Series Two Post Lifts 78 P N 5900951 Rev D May 2019 ...
Страница 79: ...XPR 10 Series Two Post Lifts 79 P N 5900951 Rev D May 2019 ...
Страница 81: ...XPR 10 Series Two Post Lifts 81 P N 5900951 Rev D May 2019 ...
Страница 82: ...XPR 10 Series Two Post Lifts 82 P N 5900951 Rev D May 2019 ...
Страница 83: ...XPR 10 Series Two Post Lifts 83 P N 5900951 Rev D May 2019 ...
Страница 84: ...XPR 10 Series Two Post Lifts 84 P N 5900951 Rev D May 2019 ...
Страница 85: ...XPR 10 Series Two Post Lifts 85 P N 5900951 Rev D May 2019 ...
Страница 86: ...XPR 10 Series Two Post Lifts 86 P N 5900951 Rev D May 2019 ...
Страница 87: ...XPR 10 Series Two Post Lifts 87 P N 5900951 Rev D May 2019 ...
Страница 88: ...XPR 10 Series Two Post Lifts 88 P N 5900951 Rev D May 2019 ...
Страница 91: ...XPR 10 Series Two Post Lifts 91 P N 5900951 Rev D May 2019 Maintenance Log ...
Страница 92: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...