XPR-10 Series Two-Post Lifts
42
P/N 5900951 — Rev. D — May 2019
2.
Starting on the inside of the Offside Post
, push the loop end of the Safety Lock Cable out
through a hole in the Offside Post.
The Offside Safety Assembly is not yet installed, so just leave the loop end of the Safety Lock
hanging out of the hole.
Not necessarily to scale. Not all components shown. The Safety Assemblies are not installed at this
point, so the Safety Cable, after being routed, will simply stay in place until later in the installation.
3.
Route the other end (the non-loop end) of the Safety Lock Cable under the Safety Sheave,
upwards on the inside of the Offside Post, up and over the Safety Sheave at the top of the Offside
Post, across the Overhead Assembly, over the Safety Sheave at the top of the Powerside Post,
and then downwards, on the inside of the Powerside Post, towards the Mounting Bracket.
Make sure the Safety Lock Cable stays on its Safety Sheaves; this keeps it out of the way of the
Equalizing Cables and the Hydraulic Lines.
4.
On the Powerside Post
, when the non-loop end of the Safety Lock Cable is near the Mounting
Bracket, route it under the Safety Sheave, then push it out of the Powerside Post through a hole in
the Post.
The Powerside Safety Assembly is not yet installed, so just leave the non-loop end of the Safety
Lock Cable hanging out of the hole.
Important
: When connecting the ends of the Safety Lock Cable later in the installation, make
sure the Cable stays in all of the Safety Sheaves. This keeps it out of the way of the
Hydraulic Lines and Equalizing Cables.
Both ends of the Safety Lock Cable will be appropriately connected during the procedure to install
the Safety Assemblies. See
Installing the Safety Assemblies
for additional information.
5.
For both Posts
, locate the two Carriage Bolts (M10 rods, ~11 in / 275 mm long, threaded on
both ends), two Nuts, and two Washers in the Parts Box, put them into place through the top of
each Post (they go all the way through the top of the Post), and tighten them in place on both
ends.
Содержание XPR-10 Series
Страница 9: ...XPR 10 Series Two Post Lifts 9 P N 5900951 Rev D May 2019 Specifications ...
Страница 77: ...XPR 10 Series Two Post Lifts 77 P N 5900951 Rev D May 2019 Labels ...
Страница 78: ...XPR 10 Series Two Post Lifts 78 P N 5900951 Rev D May 2019 ...
Страница 79: ...XPR 10 Series Two Post Lifts 79 P N 5900951 Rev D May 2019 ...
Страница 81: ...XPR 10 Series Two Post Lifts 81 P N 5900951 Rev D May 2019 ...
Страница 82: ...XPR 10 Series Two Post Lifts 82 P N 5900951 Rev D May 2019 ...
Страница 83: ...XPR 10 Series Two Post Lifts 83 P N 5900951 Rev D May 2019 ...
Страница 84: ...XPR 10 Series Two Post Lifts 84 P N 5900951 Rev D May 2019 ...
Страница 85: ...XPR 10 Series Two Post Lifts 85 P N 5900951 Rev D May 2019 ...
Страница 86: ...XPR 10 Series Two Post Lifts 86 P N 5900951 Rev D May 2019 ...
Страница 87: ...XPR 10 Series Two Post Lifts 87 P N 5900951 Rev D May 2019 ...
Страница 88: ...XPR 10 Series Two Post Lifts 88 P N 5900951 Rev D May 2019 ...
Страница 91: ...XPR 10 Series Two Post Lifts 91 P N 5900951 Rev D May 2019 Maintenance Log ...
Страница 92: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...