background image

Page 43

BOILERMA

TE 

A-CL

ASS 

OV

Gledhill

 (Water Storage) 

Ltd

  

AMD. JUNE 2008

 

 

CONDITIONS OF SALE & GUARANTEE TERMS

1.

 

Gledhill (Water Storage) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear below 

and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us to 
the exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and 
Warranty Terms override those which are contained on the Invoice Forms and all Sales are now subject to these 
Conditions of Sale and Warranty terms only.

2. PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3. SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with our 
printed literature or the literature of any of our component suppliers (subject to any modifications made since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4. PAYMENT

The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due date we 
will allow an appropriate settlement discount except where we have quoted a special net price.  If payment is not 
received in full on or before the due date we shall be entitled in addition to the invoice price to:
(i) 

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 

(ii) 

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5. TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6. DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk and 
expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had been 
despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7. 

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8. 

RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.

9. 

COMPANY LIABILITY AND GUARANTEE

9.1.  Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2.  Each Guarantee is strictly conditional upon the following:-
9.2.1.  Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2.  The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3.  All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4.  The unit has only been used for the storage of potable water supplied from the public mains.
9.2.5 Where appropriate the unit has been regularly maintained as detailed in the installation and service 

instructions 

9.2.6.  Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7.  Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.3.  Guarantees are provided in respect of specified goods supplied by Gledhills as follows:- 

(a)  Domestic and Commercial Open Vented Cylinders and Tanks.

 

The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.

  (i)    free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b)  Domestic Mains Fed Products [Primary Stores]

 

The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel assembly proves to be defective either in materials or workmanship, we reserve the right to either 
repair or supply replacements or the closest possible substitute in the case of any obsolete product and will 
collect and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).

  (i)  free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-fifth of the then current list price or any copper price supplement and 

delivery charge during the second year after delivery by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

(c)  Integrated Boiler and Storage Vessel Products and Stand Alone Boilers

 

In the case of the GulfStream range of products and the Gledhill boiler range of products,  Gledhill guarantees 
the heat exchanger (boiler) for material and construction faults for two years.  THE RESPONSIBILITY FOR THE 
EXECUTION OF THIS GUARANTEE LIES WITH THE INSTALLER.

 

The guarantee becomes null and void if the appliance is used incorrectly, or in the event of proven negligence 
or incorrectly implemented repairs 

OR FAILURE TO CARRY OUT THE RECOMMENDED INSPECTION/

MAINTENANCE

.  The guarantee also becomes null and void if changes are made to the appliance without our 

knowledge, or if the serial number on the appliance is removed or made illegible.

 

The annual service must be carried out by a competent 
installer in accordance with the advice given by 
Gledhill and using Gledhill approved parts.

(d)  Stainless Steel Unvented Cylinders

 

Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED TEMPERATURE AND PRESSURE RELIEF VALVE 
MUST NOT BE REMOVED OR ALTERED IN ANY WAY 
OR THE GUARANTEE WILL NOT BE VALID.  GLEDHILL 
WILL NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL 
LOSS OR DAMAGE HOWEVER IT IS CAUSED. 

 

The guarantee for the stainless steel vessel is for 
twenty five years if the original unit is returned to us 
AND PROVIDED THAT:   

  (i)  It has been installed as per the Design, Installation 

& Servicing Instructions, relevant standards, 
regulations and codes of practice.

  (ii)  It has not been modified, other than by Gledhill.
  (iii) It has not been subjected to wrong or improper 

use or left uncared for.

  (iv) It has only been used for the storage of potable 

water.

  (v)  It has not been subjected to frost damage.
  (vi)  The benchmark log book is completed after each 

annual service.

  (vii) The unit has been serviced annually.

 

It should be noted that the guarantee does not cover:

  -   the effects of scale build up
  -   any labour charges associated with replacing the 

unit or  parts.

 

If the stainless steel vessel proves to be defective 
either in materials or workmanship we reserve the 
right to either repair or supply replacements or the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):

 (i) free of charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one twenty fifth of the 

then current list price during the second year 
after delivery by us and increasing by a further 
one twenty fifth on the second and subsequent 
anniversary of delivery by us.

 

ACTION IN THE EVENT OF FAILURE  

 

If the stainless steel cylinder develops a leak we will 
ask for a deposit against the supply of a new one.  This 
will be refunded if the failure is within the terms of the 
warranty when it has been examined by us.

(e)  Solar Panels and ancillary equipment

 

Gledhill provides a five year warranty for defects in 
the collectors (except broken glass and collector 
accessories eg metal edgings).  If the collector 
demonstrably fails to meet one of the requirements of 
the standard DIN 4757 part 3 we will replace it free of 
charge based on the date of invoice.  We can not be 
responsible for damage caused by mechanical stress 
and/or changes caused by weather related influences.  
The warranty excludes minor surface damage that 
does not affect performance or malfunction due to 
improper assembly or installation.

Please note:

  -    Installation must have been carried out by a 

licensed specialized company (heating contractor 
or plumber) following the version of installation 
instructions in force.

  - 

  Gledhill or its representative was given the 

opportunity to check complaints on site 
immediately after any defect occurred.

 - 

 Confirmation exists that the system was 

commissioned properly and  that the system 
was checked and maintenance was performed 
annually by a specialised company licensed for 
this purpose.

(f) Components of our products other than 
Storage Vessels and Integral Pipework.  

 

We will either extend to the purchaser the same terms 
of warranty as we are given by the manufacturer of 
the component or if the manufacturer does not give 
any warranty, replace free of charge any component 
which becomes defective within two years after the 
date of the delivery by us and is returned to us at the 
purchaser’s expense but we shall not meet the cost of 
removal or shipping or return of the component or 
any other cost charges or damages incurred by the 
purchaser.

 

If the appliance manufactured by Gledhill incorporates 
a factory fitted scale inhibitor then during the period 

Содержание BoilerMate BMA 125 OV

Страница 1: ...MPLY WITH THE WATER HEATER MANUFACTURERS SPECIFICATION FOR INTEGRATED THERMAL STORES TM benchmark Thecodeofpracticefortheinstallation commissioning servicingofcentralheatingsystems Gas Council Approve...

Страница 2: ...rom 1st April 2005 this can be achieved via a Competent Person Self Certification Scheme as an option to notifying the Local Authority directly Similar arrangements will follow for Scotland and will a...

Страница 3: ...otifiable to Building Control The BoilerMate A Class OV is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience or knowledge un...

Страница 4: ...ORE AUTOMATIC BYPASS VALVE 4 2 15 2 UNLESS THE HEATING SYSTEM INCORPORATES MECHANICAL THERMOSTATIC CONTROL VALVES E G 4 2 6gS TO ALL RADIATORS OR PORT ZONE VALVES 0RIMARY FLOW 0RIMARY RETURN LASS OILE...

Страница 5: ...rature is automatically regulated to approximately 52 C at the bath flow rate of 18 litres min recommended by BS 6700 The temperature is not user adjustable 1 0 DESIGN Model BMA 125 OV BMA 145 OV BMA...

Страница 6: ...rature sensors 10 Overheat sensor 11 Y type strainer flow regulator 12 A feed and expansion cistern complete with ballvalve overflow fitting and cold feed open vent pipework assembly is supplied separ...

Страница 7: ...tional 150mm must be added to the above heights to accomodate the space required for the zone equipment APPLIANCE DIMENSIONS MODEL Height Width Depth A B C BMA 125 OV 960mm 530mm 595mm BMA 145 OV 1000...

Страница 8: ...k The BoilerMate A Class units are supplied on an installation base to allow the pipe runs to connect to the appliance from any direction It is easier if all pipes protrude vertically in the cut out a...

Страница 9: ...troller is described below The appliance selection menu A0 A9 on the controller is hidden It is only possible to get to the appliance selection using the reset button Left hand S2 on the main board Wh...

Страница 10: ...n S1 T Overheat 1 6 14 Top of store in dry pocket S1 S2 are in single housing S2 T Overheat 2 2 10 S3 T DHW in 3 11 In cold water inlet pipe Wet i e direct S4 T DHW out 4 12 In hot water outlet pipe W...

Страница 11: ...thefeed water to water heaters and the hot water circuit of combination boilers to reduce the rate of accumulation of lime scale 1 0 DESIGN To comply with this requirement the hardness of the mains wa...

Страница 12: ...anufacturer and is installed fully in accordance with their recommendations It is also essential that if an alternative pipework material system is chosen the manufacturerconfirmsthatthedesigncriteria...

Страница 13: ...it is recommended that a check valve or valves are fitted on the vertical flow pipes ThewaterlevelintheF Ecisternshouldbe at least 250mm above the highest point on thesystemincludingtheradiatorsandmus...

Страница 14: ...ernally as long as the chosen system is recommended for use on domestic heating systems by the manufacturer and is installed fully in accordance with their recommendations We always recommend the use...

Страница 15: ...and depending uponthepipelayoutamanualairventmayalso berequiredonthereturnadjacenttotheboiler see boiler installation insructions Boiler sited with dipped flow and return pipes to the BoilerMate Any...

Страница 16: ...ge 5 The radiators will only get hot when the boiler is firing Itisimportantthattheflowratesthroughthese radiators is adjusted to the minimum required at the lockshield valves on the radiators If this...

Страница 17: ...rooms within the property The electrical supplies from each appliance to the boiler will need twinning so that the boiler will operate on a call from either both appliances Bothprimarypumpsandtheprima...

Страница 18: ...ot water control rocker in the constant position and the central heating rocker to off For emergency hot water and heating put the mode rocker into Switch position and the hot waterandcentralheatingco...

Страница 19: ...tures will normally be higher than in a conventional system and the design of the cupboard and door will need to take this into account No ventilationisnormallyrequiredtothecupboard A suitable locatio...

Страница 20: ...be checked and confirmed as acceptable The plastic cover and protective wrapping should be removed from the appliance and the installation base provided and placed in position The appliance can then b...

Страница 21: ...H Incoming mains cold water I Drain valve is not provided with the appliance J Primary return for pumped summer towel rail circuit Note The safety open vent and cold feed expansion must be connected t...

Страница 22: ...Mains Supply 230VAC 50Hz 32Amps 6 0 10 0 mm Twin Earth Cable PVC 10 0mm is only required when there is a high ambiant temperature and or long cable run N L N E E SL W SL B SL R L1 L2 L3 N N N SL F N I...

Страница 23: ...CALE INHIBITOR Y White Covering Flat Ribbon Cable 1 Connection only used if Modulating Pump is fitted 1 1 SWITCH ON OFF Boiler ON OFF Heating SL H Hot Water SL W Frost Protection SL F Room Stat SL R D...

Страница 24: ...d more than 6 meters above the base of the BoilerMate A Class appliance Obviously any pipework in the roof space and the feed and expansion cistern will need to be adequately insulated to protect agai...

Страница 25: ...ll cables are routed to avoid hot surfaces The supply to the BoilerMate A Class must be protected by a type B MCB to BS EN 60898 of at least 32 amps rating Two installer supplied flex cables are requi...

Страница 26: ...t adjusted to a suitable setting When the location of the boiler means that frost protection is required for the boiler circuit only a frost thermostat and pipe mounted thermostat should be fitted in...

Страница 27: ...AS BOILER HAS BEEN FULLY TESTED COMMISSIONED AFTER THE GAS BOILER HAS BEEN COMMISSIONED MOVE MCB S 1 AND 2 TO THE ON POSITION WHICH WILL BREAK THE WARNING LABEL AND THEN COMMISSION THE SWITCH FACILITY...

Страница 28: ...ection is made to the heating return on the BoilerMate Atypicalwayofprovidingheatingandhotwater time control is shown below However other methods can be used such as using a 3 channel programmer if re...

Страница 29: ...5 o C 1 5m long 2 5mm 2 high temp flying cables CT 3 6 2 5 1 4 3 6 2 5 1 4 J5 3 6 2 5 1 4 3 6 2 5 1 4 4 8 3 7 2 6 1 5 4 8 3 7 2 6 1 5 J28 4 8 3 7 2 6 1 5 E N L M DHW Pump J34 4 8 3 7 2 6 1 5 E N L M B...

Страница 30: ...opposite will be adequate for up to a typical 3 4 bedroom property Primary Water System Treatment Although the BoilerMate has no special water treatment requirements the radiators and other parts of t...

Страница 31: ...e front panel mode rocker is in the normal position Put the hot water control rocker in the constant position and the central heating control rocker in the off position b The boiler will not start i e...

Страница 32: ...The BoilerMate controller will now Turn on the central heating pump and this will be indicated by display segment H2 2 being lit c Wait until the heating circuit has reached its normal temperature bef...

Страница 33: ...T use pipe smaller than 28mm between the boiler and the BoilerMate when the boiler rating exceeds 20kW about 68 000 Btu h 14 DON Tusedippedflowandreturnbetween theboilerandtheBoilerMateunlesstheboiler...

Страница 34: ...mGledhillusingthe SpeedSpares service or throughanyofthelargerplumbersmerchants specialist heating spares suppliers Help and advice is also available from the Technical Helpline on 08449 310000 Howeve...

Страница 35: ...tlet XB122 210 225 8 1 x 6 kW switch immersion heater Wardtec XB468 125 145 185 XB469 215 XB470 225 9 Main PCB controller Argus Vision GT490 All 10 Bottom store sensor Tasseron GT198 All 11 Middle sto...

Страница 36: ...when the hot water tap is opened and closed Check that the plate heat exchanger pump is set at maximum speed Check that the space heating and hot water load is not greater than the boiler output and...

Страница 37: ...OPTIONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also availa...

Страница 38: ...fixing holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 165mm 595mm A hot B cold blank blank...

Страница 39: ...formation and the resistance characteristics of the pipes The examples presented below are for 15mm copper pipe in table 1 and for plastic pipework in table 2 The preferred solution where space will a...

Страница 40: ...branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating control valves and backflow protection devices should be provided as necessary to...

Страница 41: ...label should be fixed to the system in a prominent location Where a combi boiler and or a hot water storage vessel is installed in areas where the mains water can exceed 200ppm Total Hardness as defin...

Страница 42: ...ng at the top of the product Each appliance is supplied with a pallet which has been attached to the unit via the packaging The pallet will also allow for one or two persons to get a good hold e Takin...

Страница 43: ...r in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all ch...

Страница 44: ...any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c unt...

Страница 45: ......

Отзывы: