Page 22
2.2 INSTALLATION
2.0 INSTALLATION
Or
Wh
Br
Br
Br
Bl
Br
R
R
R
R
R
R
Br
Bl
M
1
2
3
5
4
GRASSLIN CLOCK
Hot Water
Central Heating
N
L
23
4
1
ON
SPD1/2A
OPTIONAL
EXTRA
IF FITTED
(PART No XB142)
S 3
S 4
S 5
S 6
Store overheat sensors
Cold Water IN
Domestic Hot Water OUT
Bottom store sensor
1K5 Resistor (White)
Middle store sensor
S1 & S2
ID_RESISTOR
SENSOR LEGEND
Blue
Bl
Brown
Br
Green
Grey
Green / Yellow
G
Gr
G/Y
WIRE COLOUR LEGEND
Black
Orange
Yellow
White
Red
B
Or
Y
Y
Wh
R
2 DOUBLE POLE
CHANGE OVER SWITCHES
WITH CENTRE OFF
FACTORY FITTED CLOCK
(STANDARD) OPTION
RELAY R1
0
1
200 - 240Vac 50Hz
6B
2A
5B
2A
5B
3A
4B
3A
1A
6B
4B
1A
Br
Br
2
8
6
4
Br
Br
Br
MCB 2
MCB 1
MCB 3
16A
6A
16A
Mains Supply
230VAC 50Hz 32Amps
6.0/10.0 mm² Twin & Earth Cable PVC
(10.0mm² is only required when there is a high
ambiant temperature and/or long cable run)
N
L
N
E
E
SL-W
SL-B
SL-R
L1
L2
L3
N
N
N
SL-F
N-IH
L-IH
L-IH
2.5 mm SID Silicone
2
Bl
Bl
R
2 x 3kW Heating Elements
R
SL-H
E
E
PE-IH
2.5 mm SID Silicone
2
2.5 mm Solid Core PVC
2
2.5 mm SID Silicon
2
2.5 mm SID Silicone
2
2.5 mm SID Silicone
2
4.0 mm SIF Silicone
2
2.5 mm SIF Silicone
2
2.5 mm SIF Silicone
2
2.5 mm SIF Silicone
2
2.5 mm SIF Silicone
2
2.5 mm SID Silicone
2
3
1
2
4
ISSUE No : 7
APPROVED
DATE : MAY 2007
DO NOT SCALE FROM THIS DRAWING. COPYRIGHT OF THIS DRAWING
IS RESERVED. IT IS NOT TO BE REPRODUCED COPIED OR DISCLOSED
TO A THIRD PARTY EITHER WHOLLY OR IN PART WITHOUT OUR
WRITTEN CONSENT.
© GLEDHILL WATER STORAGE LTD.
DRN.
SIGN.
SIGN.
DATE
DATE
APP'D.
CH'KD.
DATE
04-05-07
04-05-07
04-05-07
S. McGachie
S. Gataora
S. Gataroa
Содержание BoilerMate BMA 125 OV
Страница 45: ......