Page 33
BOILERMA
TE
A-CL
ASS
OV
2.0 INSTALLATION
2.3 COMMISSIONING
10. DO ensure that the bypass valve for the
heating system (if fi tted) is set correctly.
11. DON’T use a combined feed and vent on
BoilerMate installations.
12. DON’T use a BoilerMate on a sealed primary
i.e. closed system.
13. DON’T use pipe smaller than 28mm
between the boiler and the BoilerMate when
the boiler rating exceeds 20kW (about 68,000
Btu/h).
14. DON’T use dipped fl ow and return between
the boiler and the BoilerMate unless the boiler is
fi tted with an overheat thermostat. If necessary
check with the suppliers of the boiler.
15. DON’T operate the ‘switch’ backup facility
until the system is fully fitted, vented and
commissioned.
16. DON’T place any clothing or other
combustible materials against or on top of
this appliance.
Содержание BoilerMate BMA 125 OV
Страница 45: ......