H2AIR
®
ARCH
18
Belanger, Inc.® *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL958
Installation
Prepare to Assemble Arch
1) From the Head Beam remove and discard the shipping brackets and nuts. Be sure to keep the
bolts and locking washers these will be used to attach the Leg Assemblies to the Head Beam.
2) Secure the H2AIR® Top Beam Assembly to a forklift and position it in the approximate location
in the tunnel.
3) Orient the H2AIR® Top Assembly in the tunnel so the Belanger® Logo faces the entrance of the
tunnel and the DryLite
™ Air Cannon™ Nozzles face the exit of the tunnel, see image below.
Driver Side
Passenger Side
View from Entrance of Tunnel
Shipping
Bracket to
be discarded
Shipping
Bracket to
be discarded
Nuts to be
discarded
Bolts & Lock Washers
to be used to attach
Legs to Head Beam
Top Flip Dryer
Assembly
Head Beam
Top Manifolds
with LED Lights