AIRBLADE® DRYER
Mix and Match
8
Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681
1MANUL011
Introduction
When assembling the AirBlade® Dryer, pay close attention to the required operating
envelope. That is the space needed to operate properly shown in the drawings.
This manual will cover all procedures for all available systems.
It would be very beneficial to have a leveler of some sort on hand. In order to achieve
optimum performance, the Air Cannon™ nozzles for the 40HP and the 60HP systems
should be mounted in specific positions. Levelers can be purchased at any good hardware
store (Home Depot).
This document is laid out in eight sections.
•
2 Nozzle Wall Mount System
•
2 Nozzle Floor Mount System
•
4 Nozzle Wall Mount System
•
4 Nozzle Floor Mount System
•
6 Nozzle Wall Mount System
•
6 Nozzle Floor Mount System
•
10 Nozzle Wall Mount System
•
10 Nozzle Floor Mount System
Refer to the supplied drawings for positioning nozzles to the proper angles.
Nozzle location and positioning was determined at the factory to fit a wide brand
of vehicles. Your installation preference may vary based on vehicle and building
restraints.
Typical Leveler