EN
Installation and operating manual
DRYPOINT
®
M eco control
47
29. Place the control unit on the membrane dryer head
(
DRYPOINT
®
M
).
30. Tighten the fixing screws with washers for the
membrane dryer head using an Allen key.
Ø = 4 mm
M = 2,5 Nm + 0,5 %
31. Replace the cord packing in the hood and check for
correct position in the groove.
32. Route the ribbon cable to the right into the cable run
and carefully close the hood of the control unit to the right.