Installation and operating manual
EN
34
DRYPOINT
®
M eco control
12. Route the ribbon cable to the right into the cable run
and carefully close the hood of the control unit to the right.
13. Tighten the screws for the hood of the control unit using
an Allen key.
Ø = 2 mm
M = 0,6 Nm + 10 %