Installation and operating manual
EN
32
DRYPOINT
®
M eco control
4. Lift the control unit off the membrane dryer head.
5. Unscrew the screws from the hood of the new control
unit using an Allen key.
Ø = 2 mm
M = 0,6 Nm + 10 %
6. Open the hood of the control unit carefully to the left.
Route the ribbon cable to the left out of the cable run.
7. Insert washers and fixing screws for the membrane dryer
head.
Ø = 4 mm
M = 2,5 Nm + 0,5 %