2 Specification
2.1
Appearance of machine
2.2
Major technical parameter
Applicable material:
PVC
or other plastic materials
Laminate layout:
4
8 or 4
6 or 5
5 or 3
5
The number of mould plates:
6
each of cool and heat
Size of mould plates:
420
520 mm
Interval between mould plates:
50mm
Material layers (Max.):
15
Working pressure:
1~15MPa
adjustable
Pressure precision:
0.5MPa
Heat temperature:
160
Temp. control:
1.5
Cylinder travel:
280mm
Hydraulic tank volume:
320 litre
Power supply:
AC380V 50/60Hz 5-phase
Power:
21kW
Productivity (cards):
2400
cards per cycle at layout 4 x 8
Dimension:
L2300×W700×H1800mm
Weight:
appr.3500 kg
3 Installation
3.1 Environment of install
3.1.1
Install place The place should be far away from inflammables, there is
no combustible air in workshop, do not stack any goods behind the machine.
3.1.2
Ground requirement the machine should be installed inside a standard
industry factory building. The installed ground should be smooth and solid. A
depth of concrete pad will not be less than 200mm. If an installation is at
second floor or above, have to be sure that the bearing of floor meets
requirements.
3.1.3
Environment of install the workshop should be airtight, dustless and
have the ventilation installation.
3.1.4
The requirement of Power source Power supply is as AC380V/50Hz, 5
wires in 3-phase, ground wire is grounded reliably. Ground resistance < 0.1
.
Ground wire > 4 mm
2
3.2 Load and unload machine
Select lifting place based on the mark of gravity center. Keep the machine in
equilibrium throughout lifting. When using a crane to lift, need to select the
suitable sling rope. The rope should be pulled straight and try first to slide
down. Do not let the rope damage the outside and any parts of the machine.
3.3 Unpack and lay down machine
3.3.1
Check on the outer package of machine, if there is any damage, please
inform supplier. Otherwise unpack the package.
3.3.2
Level off body of machine with a level. If a floor is not smooth, try to put
some pads until making the machine level.
3.3.3
Open a cap of oil tank then fully pouring oil. Using a hydraulic wear oil of
46 #.
Note: Hydraulic oil must be accorded with the standards and make sure that the oil is
clean. An improper use or unclean oil could speed up the wear of oil tank and
hydraulic system.