B11953AC
xxiii
Introduction
Overview
This manual details the necessary site preparation required before installing the CESI 8000 High
Performance Separation System. Pay careful attention to the specifications and requirements
described in this manual. Accurate and timely preparation allows the Beckman Coulter Field
Service Engineer to install the instrument efficiently upon arrival.
The supplies you must have on hand prior to the installation of the instrument are specified. Also
provided is a list of accessories available.
For your convenience, a
is included to help you prepare for the installation.
This preinstallation manual covers:
•
•
Site Requirements and Specifications
•
•
IMPORTANT
The “Customer Preinstallation and Sign-off Sheet” on the next page must be completed and
sent to your CESI 8000 representative before installation of the CESI 8000 system can begin.
Содержание CESI 8000
Страница 11: ...B11953AC xi Beckman Coulter CESI 8000 Beckman Coulter Beckman Coulter Inc Beckman Coulter...
Страница 13: ...B11953AC xiii Beckman Coulter 144557 AB...
Страница 14: ...B11953AC xiv RoHS CESI 8000 CESI 8000 CESI 8000 OptiMS OptiMS MS RoHS SJ T11364 2006 RoHS EFUP EFUP RoHS e EFUP...
Страница 15: ...B11953AC xv CESI 8000 WEEE WEEE 2005 8 13 WEEE Beckman Coulter CE CE CESI 8000 EEA...
Страница 16: ...B11953AC xvi C Tick CESI 8000 C Tick EMC CSA CESI 8000 CSA NRTL...
Страница 22: ...xxii Tables...
Страница 34: ...B11953AC 2 8 Site Requirements and Specifications Electrical Requirements...
Страница 38: ...B11953AC 3 4 Preparing CESI 8000 for Setup Upon Receiving the CESI 8000 System...
Страница 40: ...B11953AC 4 2 CESI 8000 System Training Additional Training...
Страница 45: ......