B11953AC
1-1
CHAPTER 1
Preinstallation Requirements
Preparation Check List
The following is a summarized list of the requirements that must be addressed, and the components
that must be obtained, prior to installation. To ensure a successful installation, please verify that
the requirements have been fulfilled and that you have the system components listed below. When
completed, contact your local Beckman Coulter representative to schedule the installation.
IMPORTANT
CESI 8000 customers (i.e., up to two operators) must be Mass Spectrometer trained, willing to
be trained, and available to operate the Mass Spectrometer during installation.
CESI 8000 Requirements
Use this list to check the requirements that must be fulfilled at your site prior to installation.
•
All reagents must be ordered and present at the site by the time of installation (
Site Requirements and Specifications
•
Suitable laboratory environment (
Site Requirements and Specifications
)
•
Appropriate space for cart and instrument (
Space and Ventilation Requirements
Site Requirements and Specifications
)
•
Power source (
Site Requirements and Specifications
•
All components arrived undamaged (
Upon Receiving the CESI 8000 System
•
Training prerequisites met (
CESI 8000 System Components
The following is a list of the primary components shipped by Beckman Coulter for a CESI 8000
system. Use this list to check off the items as you receive them.
System Components
•
CESI 8000 Instrument
•
CESI 8000 Mobile Cart
•
CESI 8000 Computer System
Содержание CESI 8000
Страница 11: ...B11953AC xi Beckman Coulter CESI 8000 Beckman Coulter Beckman Coulter Inc Beckman Coulter...
Страница 13: ...B11953AC xiii Beckman Coulter 144557 AB...
Страница 14: ...B11953AC xiv RoHS CESI 8000 CESI 8000 CESI 8000 OptiMS OptiMS MS RoHS SJ T11364 2006 RoHS EFUP EFUP RoHS e EFUP...
Страница 15: ...B11953AC xv CESI 8000 WEEE WEEE 2005 8 13 WEEE Beckman Coulter CE CE CESI 8000 EEA...
Страница 16: ...B11953AC xvi C Tick CESI 8000 C Tick EMC CSA CESI 8000 CSA NRTL...
Страница 22: ...xxii Tables...
Страница 34: ...B11953AC 2 8 Site Requirements and Specifications Electrical Requirements...
Страница 38: ...B11953AC 3 4 Preparing CESI 8000 for Setup Upon Receiving the CESI 8000 System...
Страница 40: ...B11953AC 4 2 CESI 8000 System Training Additional Training...
Страница 45: ......