PN B38322AA
3-8
Operations
Manual Operation
Step 5: Set the Temperature
Select the
Set Temp
Display/Button to go to the
Set Temperature
Page.
Figure 3.8
Set Temperature Page
On the
Set Temperature
Page, follow two steps:
Setting the Temperature
1
Use the keypad to set the desired temperature in degrees Celsius. Use the
Back
and
Clear
keys
to make corrections.
2
Select the
OK
key to accept your entry and dismiss the page.
Step 6: Start the Run
Once the run values are set, start the run:
NOTE
If you have entered a delayed start, you must select the
Start
button to begin the countdown to the
delayed start.
1
Prepare your samples and place them in the rotor following all proper procedures, including
balanced weight distribution.
2
Preheat or precool the rotor and samples, if necessary.
Содержание Avanti JXN-26
Страница 4: ...PN B38322AA iv Revision History...
Страница 21: ...xxi Contents Abbreviations Index Beckman Coulter Inc Avanti JXN Series Centrifuge Warranty Related Documents...
Страница 30: ...PN B38322AA xxx Introduction Symbols Symbols...
Страница 32: ...PN B38322AA xxxii Introduction Graphics...
Страница 44: ...PN B38322AA 1 12 Description Available Rotors...
Страница 54: ...PN B38322AA 2 10 The Touch Screen Interface About Your Instrument...
Страница 154: ...PN B38322AA 6 60 Functional Pages Zonal Operation Page...
Страница 168: ...PN B38322AA 7 14 Maintenance and Troubleshooting Supply List...
Страница 176: ...PN B38322AA A 8 Preinstallation Requirements Using J2 Series Rotors in the Avanti JXN Series...
Страница 194: ...PN B38322AA D 12 Third Party Contributions and Legal Notices Contributions and Legal Notices...
Страница 196: ...PN B38322AA E 2 HEPA Filter Replacement Instructions for the Avanti JXN Series Centrifuges HEPA Filter Replacement...
Страница 198: ...PN B38322AA Abbreviations 2 Abbreviations...
Страница 206: ...Index 8 Index...
Страница 208: ...PN B38322AA Warranty 2 Beckman Coulter Inc Avanti JXN Series Centrifuge Warranty...
Страница 209: ......