![Baxi ECOGEN 24/1.0 Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788079.webp)
17.6 Automatic reset
1. If a flashing spanner is shown on the THINK Controller the error may reset once the condition has cleared. Many of these automatic reset errors are connected with
temperature sensors of both the system and the appliance and once the appliance has cooled it may restart. If the problem persists where the same error code is
repeatedly displayed or the error will not clear you should call for a service engineer.
17.7 User reset
1. A user reset can only be carried out on the THINK Controller or 5 LED Receiver not on a room sensor.
2. To perform a user reset:
a) on the 5 LED Receiver, press the reset button at the bottom of the Receiver, after a further 6 flashes the red LED will go out.
b) on the appliance THINK Controller, from the standard screen press the Selector Button twice, after a few seconds the error symbol should disappear.
3. The error will clear and the appliance will restart if there is a demand for heat as long as the error condition has cleared.
4. If the error returns the fault condition is still present.
17.8 Service reset
1. When a flashing spanner is accompanied by a crossed out flame symbol on the appliance, a fault has occurred which requires the presence of a service engineer. When
ringing the Heateam Service Department to request a service engineer please quote the error code and accompanying message along with the serial number of appliance.
page 80
2. A Service reset should only be carried out by a service engineer after making a note of the error code. Untrained personnel who perform a service reset may void the
warranty.
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...