![Baxi ECOGEN 24/1.0 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788037.webp)
Fig. 34 & Fig. 35
Fig. 36 & Fig. 37
Fig. 38 & Fig.39
8. Adjust the two telescopic sections to dimension 'Y' (
). Ensure that the rivets and holes in the Connection Assembly are aligned horizontally (
).
9. Using a 2mm bit, drill through the holes at the end of the Connection Assembly into the Terminal Assembly and secure them together using the screws supplied (
).
Seal the joint with the tape provided (
).
10. Remove the flue elbow and insert the flue through the hole in the wall. Refit the elbow to the boiler adaptor, ensuring that it is pushed fully in (
).
12. Ensure that the terminal is positioned with the slots to the bottom (
). Secure the flue to the elbow with the self drilling screws supplied (
).
IMPORTANT: It is essential that the flue terminal is fitted as shown to ensure correct boiler operation and prevent water entering the flue.
13. If necessary make good between the wall and air duct outside the building.
14. Fit the flue trim if required, and if necessary fit a terminal guard (see
&
).
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...