![Baxi ECOGEN 24/1.0 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788051.webp)
b) This will release the second security measure now that the top bracket has been removed. The push on connector can be disengaged from the cut out and
reconnected to the return temperature sensor (
&
) (the appliance will not operate until this reconnection is made, Error 40 will show).
2. Refit the control tray, the bottom panel and the outercase before switching on the appliance.
3. Ensure that the filling loop is connected and open, then open the heating flow and return valves on the boiler.
4. The system must be flushed in accordance with BS 7593 (see
) and the flushing agent manufacturers instructions.
5. Pressurise the system to 1.5 bar then close and disconnect the filling loop.
6. Turn the gas supply on and purge the system according to in
GB BS 6891 (Natural Gas) BS 54821 (Propane Gas) and in
IE I.S. 813 "Domestic Gas Installations".
IMPORTANT : Lockout may occur and Error Codes E261 & E262 displayed if the gas supply pipe is not adequately purged.
7. Test for gas tightness.
Fig. 48 & Fig. 49
Fig. 48a & Fig. 48b
page 51
11.3 Commissioning of Controls
Every time the appliance is powered up, the controls carries out 2 checking functions
a) 315: Initialization Main PCB gathers data on connections and sensors. This takes around 2 minutes.
b) 312: Deaeration Function all circulation valves are opened and the circulating pump is exercised. On for 6 seconds off for 5 seconds for 4.5 minutes. See
aeration function
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...