![Baxi EcoBlue Advance 16 Heat ErP Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/baxi/ecoblue-advance-16-heat-erp/ecoblue-advance-16-heat-erp_installation-and-service-manual_2711776023.webp)
Fig. 9
Fig. 10
5.3.6 Clearances - Access in Service
A flat vertical area is required for the installation of the boiler.
1.
These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement (
Figs. 9
&
10
).
Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler.
2.
*These are MINIMUM recommended dimensions. Greater clearance will aid installation and maintenance.
page 29
Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
23 of 55
23/01/2018, 11:44