![Baxi EcoBlue 12 System ErP Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/baxi/ecoblue-12-system-erp/ecoblue-12-system-erp_installation-and-service-manual_2711775074.webp)
74
*A
ll
insta
ll
ations in Eng
l
and and Wa
l
es must be
to Loca
l
Authority Bui
l
ding Contro
l
(LABC) either direct
l
y or through a
Competent Persons Scheme
.
A Bui
l
ding Regu
l
ations Comp
l
iance
wi
ll
then be issued to the customer
.
www
.
centra
l
heating
.
co
.
uk
©
Heating
and
Hotwater
I
ndustry
Counci
l
(HH
I
C)
Th
i
s
Comm
i
ss
i
on
i
ng
Check
li
st
i
s
to
be
comp
l
eted
i
n
f
u
ll
by
the
competent
person
who
comm
i
ss
i
oned
the
bo
il
er
as
a
means
o
f
demonstrat
i
ng
comp
li
ance
w
i
th
the
appropr
i
ate
Bu
il
d
i
ng
Regu
l
at
i
ons
and
then
handed
to
the
customer
to
keep
f
or
f
uture
re
f
erence.
Fai
l
ure
to
insta
ll
and
commission
according
to
the
manufacturer’s
instructions
and
comp
l
ete
this
Benchmark
Commissioning
Check
l
ist
wi
ll
inva
l
idate
the
warranty
.
This
does
not
affect
the
customer’s
statutory
rights
.
GAS
BO
I
LER
SYSTEM
COMM
I
SS
I
ON
I
NG
CHECKL
I
ST
Customer
name:
Te
l
ephone
number:
Address:
Boi
l
er
make
and
mode
l
:
Boi
l
er
seria
l
number:
Commissioned
by
(PR
I
NT
NAME):
Gas
Safe
register
number:
Company
name:
Te
l
ephone
number:
Company
address:
Commissioning
date:
CONTROLS
(tick
the
appropriate
boxes)
Time
and
temperature
contro
l
to
heating
Room
thermostat
and
programmer/timer
Programmab
l
e
room
thermostat
Load/weather
compensation
Optimum
start
contro
l
Time
and
temperature
contro
l
to
hot
water
Cy
l
inder
thermostat
and
programmer/timer
Combination
Boi
l
er
Heating
zone
va
l
ves
Fitted
Not
required
Hot
water
zone
va
l
ves
Fitted
Not
required
Thermostatic
radiator
va
l
ves
Fitted
Not
required
Automatic
bypass
to
system
Fitted
Not
required
Boi
l
er
inter
l
ock
Provided
ALL
SYSTEMS
’s
instructions
Yes
What
system
c
l
eaner
was
used?
What
inhibitor
was
used?
Q
uantity
l
itres
Yes
No
CENTRAL
HEAT
I
NG
MODE
measure
and
record:
Gas
rate
m
³
/hr
OR
ft
³
/hr
Burner
operating
pressure
(if
app
l
icab
l
e)
mbar
OR
Gas
in
l
et
pressure
mbar
°C
Centra
l
heating
return
temperature
°C
COMB
I
NAT
I
ON
BO
I
LERS
ONLY
I
s
the
insta
ll
ation
in
a
hard
water
area
(above
200ppm)?
Yes
No
Yes
No
DOMEST
I
C
HOT
WATER
MODE
Measure
and
Record:
Gas
rate
m
³
/hr
OR
ft
³
/hr
Burner
operating
pressure
(at
maximum
rate)
mbar
OR
Gas
in
l
et
pressure
at
maximum
rate
mbar
Co
l
d
water
in
l
et
temperature
°C
Hot
water
has
been
checked
at
a
ll
out
l
ets
Yes
Temperature
°C
I
/min
CONDENS
I
NG
BO
I
LERS
ONLY
The
condensate
drain
has
been
insta
ll
ed
in
accordance
with
the
manufacturer’s
instructions
and/or
BS5546/BS6798
Yes
ALL
I
NSTALLAT
I
ONS
Record
the
fo
ll
owing:
At
max
.
rate:
CO
ppm
AND
CO/CO
²
Ratio
At
min
.
rate:
(where
possib
l
e)
CO
ppm
AND
CO/CO
²
Ratio
The
heating
and
hot
water
system
comp
l
ies
with
the
appropriate
Bui
l
ding
Regu
l
ations
Yes
The
boi
l
er
and
associated
products
have
been
insta
ll
ed
and
commissioned
in
accordance
with
the
manufacturer’s
instructions
Yes
The
operation
of
the
boi
l
er
and
system
contro
l
s
have
been
demonstrated
to
and
understood
by
the
customer
Yes
The
manufacturer’s
l
iterature,
inc
l
uding
Benchmark
Check
l
ist
and
Service
Record,
has
been
exp
l
ained
and
l
eft
with
the
customer
Yes
Commissioning
Engineer’s
Signature
Customer’s
Signature
www
.
centra
l
heating
.
co
.
uk