background image

Bavaria 32 

 

Bavaria Yacht Bau GmbH 

(39) 

– 6 –

 

EC-Declaration of Conformity 

 

corresponding to the EC- Recreational Craft Directive 94/25/EC, Annex XV 

 
 

With this we declare that the design and type of the following characterised yacht as well as the carried 
out product that was brought into service by us is conform to the essential health and safety requirements 
of the European Recreational Craft Directive. 
This declaration will lose its validity if anyone carries out changes on board which touch the ‘essential 
safety requirements’ and are not settled amongst ourselves. 
 
 
Description of the boat:  

 

Bavaria 32 

 
Type: 

:    Keelyacht 

 

 
Series number of the hull: 

 

DE-BAVU32Y0E303

 

 

Category of design: 

 

 

A (OCEAN) 

 
Module of certification:  

 

Aa 

 

Relevant Directive: 

 

 

EC Recreational Craft Directive (94/25/EC) 

 

Used 

standards: 

   see 

annex 

 

Examining authority:    

 

Lloyd‘s Register Quality Assurance GmbH 

     - 

Yacht 

Services 

Address: 

 

 

 

Mönckebergstr. 27; D – 20095 Hamburg 

 

Module: Aa 

 

 

 

EC-conformity certificate no.: HYS 0111007 

 

 

Date / Signature of manufacturer 

 

 

 

 

 

 

30.04.2003    Winfried Herrmann 

 Manager 

 

Manufacturer: Bavaria Yachtbau GmbH; Bavariastr. 1; 97232 Giebelstadt; GERMANY 

Содержание BAVARIA 32

Страница 1: ...Manual for Owners and Skippers Sailing yacht BAVARIA 32 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Страница 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC instal...

Страница 3: ...lities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressin...

Страница 4: ...n Actually the EC Directive intends for yachts of this size the certification module Aa only That means that the manufacturer certifies the correspondence of construction and equipment with the Direct...

Страница 5: ...code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see Declaration of Conformity Warnings Many chapters of this manual will support a troublefr...

Страница 6: ...ries out changes on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 32 Type Keelyacht Series number of the hull DE BAVU32Y0E30...

Страница 7: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 7...

Страница 8: ...rt 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Si...

Страница 9: ...ded fixed propeller made from an aluminium alloy Option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection option socket CEE plug current operated 230 V e...

Страница 10: ...2 Bavaria Yacht Bau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresail reef...

Страница 11: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 11 1 2 2 Deck arrangement...

Страница 12: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 12 1 2 3 Accomodation plan...

Страница 13: ...per shroud 2x permanent backstay tackle 1x Running Rigging Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional tripp...

Страница 14: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 14 Engine plant...

Страница 15: ...the pantry An interruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut...

Страница 16: ...s supplied via a suction pipe from the upper edge of the tank Due to the short distance a fire proof fuel pipe is used This is led via a wide meshed filter water separator fuel pump and fine filter to...

Страница 17: ...d secured at the top of the tiller wheel The steering wheel got a built in brake which you can fasten Make always sure that this brake is not tight especially when sailing with the auto pilot This wou...

Страница 18: ...installed at the transom of the yacht The power is supplied into a shore connection unit placed under the chart table The plug box is operational as soon as the shore supply cable has been plugged in...

Страница 19: ...s have absolute priority In case of a lack of capacity all other consumers have to be switched off first By a stand by operation of the engine even when under sail the batteries can be brought up rath...

Страница 20: ...ce and maintenance must be carried out by a qualified specialist Warning To avoid the danger of a rush of current or fire The shore connection cable must never hang into water Plug the shore connectio...

Страница 21: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 21 2 5 6 Distribution of electric devices...

Страница 22: ...atterie 55 Ah 1 Bord battery 140 Ah Bordstromkreis Batterie 140 Ah 1 o 2 16 Battery charger option Batterieladeger t Option 1 17 Electric panel Elektro Panel 1 18 Main switch Batterie Hauptschalter 1...

Страница 23: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 23 2 5 7 Wiring plans...

Страница 24: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 24 2 5 8 Distribution plans...

Страница 25: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 25 2 5 9 AC distribution...

Страница 26: ...replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require care...

Страница 27: ...ust gas pipes at least once a year Replace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of mater...

Страница 28: ...t the position and use of all fire extinguishers and the fire retarding cloth the position and function of the opening for the extinguisher s nozzle in the engine room bulkhead the exit through the es...

Страница 29: ...eplaced if necessary A constant flow of sea water has to be guaranteed The hose is secured at its joints with two clips If there is an interruption of the sea water flow the temperature sensor in the...

Страница 30: ...se nipples All hose connections are secured with two clips each For the cockpit drain special plastic joints are used Maintenance note The tightness of board ducts should be inspected regularly Check...

Страница 31: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 31 Board ducts...

Страница 32: ...t exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should...

Страница 33: ...between the caulking material and the sides of the joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continuous f...

Страница 34: ...ade out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As an...

Страница 35: ...tions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engine manual Store the fully charged batteries at a ventilated fros...

Страница 36: ...per to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitable mean...

Страница 37: ...working instructions hand operated bilge pump compass bilge pump WC instruction elapsed time indicator Proof of identity to be completed by the dealer or party to the contract 1 First launch 2 Date of...

Страница 38: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 38...

Страница 39: ...32 Bavaria Yacht Bau GmbH 39 39 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 32 HIN DE BAVU32Y0E303 Signature _____________________...

Отзывы: