Bavaria Yachts BAVARIA 32 Скачать руководство пользователя страница 36

Bavaria 32 

 

Bavaria Yacht Bau GmbH 

(39) 

– 36 –

5. Final remarks and notes 

 

This manual is in conformity with the directives of the harmonised European Norm EN 10240. Much of it 
might go without saying for you. Nevertheless we hope, that dealing with the different chapters of this 
manual will help you to understand the technical systems and the ideas behind them. As already 
mentioned in the introduction, the purpose of this manual is to contribute to an unspoilt use of the yacht. 
 
Among the things that are not dealt with are e.g. the personal safety equipment. This solely belongs to the 
responsibilities of the skipper. It goes without saying that there have to be means of rescue for all persons 
on board. But this also includes the procurement and maintenance of a life raft, of signalling means, a 
first-aid- as well as a tool-kit. 
Since the European Recreational Craft Directive pays special attention to fire protection it shall also be 
mentioned, that fire extinguishers have to be maintained in regular intervals and that it belongs to the 
duties of a skipper to introduce his crew into their operation. 
Those being prepared for an emergency are normally never involved. But just in case: the yacht is 
properly equipped for those situations with suitable means. 
 
 
 
We are constantly working on further developments of our sailing yachts. We hope you will understand 
that we have to reserve the right to carry out changes as far as form, equipment and technology is 
concerned. For these reasons you cannot lay claim to a complete correspondence of your yacht with the 
information, figures and descriptions in this manual. 
 
If your yacht should be equipped with any details not being referred to in this manual or in the owner’s 
file, your party to the contract will inform you about the correct operation and maintenance.  
 
Since all yachts, manufactured by 

BAVARIA Yachtbau GmbH

, are exclusively sold by official dealers 

there is no contractual relationship between the yard and the customer/owner. 
 
Thus 

BAVARIA Yachtbau GmbH

 is not familiar with details of the contract between the dealer and the 

customer. That’s why it is not urgently necessary that your party to the contract takes over the full extent 
of our warranty conditions. 
So, if you have to make a claim it is unavoidable to contact your party to the contract. 

 
 
 
 

Содержание BAVARIA 32

Страница 1: ...Manual for Owners and Skippers Sailing yacht BAVARIA 32 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Страница 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC instal...

Страница 3: ...lities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressin...

Страница 4: ...n Actually the EC Directive intends for yachts of this size the certification module Aa only That means that the manufacturer certifies the correspondence of construction and equipment with the Direct...

Страница 5: ...code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see Declaration of Conformity Warnings Many chapters of this manual will support a troublefr...

Страница 6: ...ries out changes on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 32 Type Keelyacht Series number of the hull DE BAVU32Y0E30...

Страница 7: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 7...

Страница 8: ...rt 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Si...

Страница 9: ...ded fixed propeller made from an aluminium alloy Option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection option socket CEE plug current operated 230 V e...

Страница 10: ...2 Bavaria Yacht Bau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresail reef...

Страница 11: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 11 1 2 2 Deck arrangement...

Страница 12: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 12 1 2 3 Accomodation plan...

Страница 13: ...per shroud 2x permanent backstay tackle 1x Running Rigging Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional tripp...

Страница 14: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 14 Engine plant...

Страница 15: ...the pantry An interruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut...

Страница 16: ...s supplied via a suction pipe from the upper edge of the tank Due to the short distance a fire proof fuel pipe is used This is led via a wide meshed filter water separator fuel pump and fine filter to...

Страница 17: ...d secured at the top of the tiller wheel The steering wheel got a built in brake which you can fasten Make always sure that this brake is not tight especially when sailing with the auto pilot This wou...

Страница 18: ...installed at the transom of the yacht The power is supplied into a shore connection unit placed under the chart table The plug box is operational as soon as the shore supply cable has been plugged in...

Страница 19: ...s have absolute priority In case of a lack of capacity all other consumers have to be switched off first By a stand by operation of the engine even when under sail the batteries can be brought up rath...

Страница 20: ...ce and maintenance must be carried out by a qualified specialist Warning To avoid the danger of a rush of current or fire The shore connection cable must never hang into water Plug the shore connectio...

Страница 21: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 21 2 5 6 Distribution of electric devices...

Страница 22: ...atterie 55 Ah 1 Bord battery 140 Ah Bordstromkreis Batterie 140 Ah 1 o 2 16 Battery charger option Batterieladeger t Option 1 17 Electric panel Elektro Panel 1 18 Main switch Batterie Hauptschalter 1...

Страница 23: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 23 2 5 7 Wiring plans...

Страница 24: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 24 2 5 8 Distribution plans...

Страница 25: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 25 2 5 9 AC distribution...

Страница 26: ...replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require care...

Страница 27: ...ust gas pipes at least once a year Replace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of mater...

Страница 28: ...t the position and use of all fire extinguishers and the fire retarding cloth the position and function of the opening for the extinguisher s nozzle in the engine room bulkhead the exit through the es...

Страница 29: ...eplaced if necessary A constant flow of sea water has to be guaranteed The hose is secured at its joints with two clips If there is an interruption of the sea water flow the temperature sensor in the...

Страница 30: ...se nipples All hose connections are secured with two clips each For the cockpit drain special plastic joints are used Maintenance note The tightness of board ducts should be inspected regularly Check...

Страница 31: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 31 Board ducts...

Страница 32: ...t exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should...

Страница 33: ...between the caulking material and the sides of the joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continuous f...

Страница 34: ...ade out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As an...

Страница 35: ...tions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engine manual Store the fully charged batteries at a ventilated fros...

Страница 36: ...per to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitable mean...

Страница 37: ...working instructions hand operated bilge pump compass bilge pump WC instruction elapsed time indicator Proof of identity to be completed by the dealer or party to the contract 1 First launch 2 Date of...

Страница 38: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 38...

Страница 39: ...32 Bavaria Yacht Bau GmbH 39 39 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 32 HIN DE BAVU32Y0E303 Signature _____________________...

Отзывы: