background image

Bavaria 32 

 

Bavaria Yacht Bau GmbH 

(39) 

– 33 –

 

4. Maintenance 

 

4.1 Maintenance, cleaning 
1. Mast and rigging 

See: Notes of the manufacturer 
 

2. Sails 

The sails are made of Dacron. This material is very robust and resistant. Thus the sails keep their 
form for 

a very long time. 

Inspect all your running and standing rigging carefully for sharp edges, splints, protruding ends of wire 
and the like because laminated cloth is especially sensitive against touching them. Those parts of the cloth 
that can chafe at spreaders or shrouds should be protected on both sides by sticking self-adhesive cloth to 
them. The same goes for the foot of the sail if there is the possibility of chafing at the rails. 

 

 
 
 
 
 
 
 
 
 
 
 

Cleaning 

Please clean your yacht immediately after you have taken it out of the water. High pressure cleaning 
devices will remove any growth. This is followed by an upkeeping of the surface of the yacht. All paint 
manufacturers provide detailed instructions for their coating systems. 
For ships sailing in salt waters: remains of salt absorb water and can cause a faster corrosion. Where- and 
whenever it is possible you should rinse the yacht and parts of it with fresh water. 

Care and maintenance of teak decks 

Untreated teak weathers to an natural silver-grey colour, with no detriment to the timber’s strength or 
other mechanical/physical properties. Because of teak’s inherent durability and weather-resistant 
properties, the use of protective paints or coatings is neither necessary nor advisable. 
Practical tips on care and maintenance: 

Protective wood care oils

 – penetrate deep into the timber, and under the influence of heat and moisture 

can adversely affect the adhesion of the caulking material to the sides of the joint. As a result, the seal 
between the caulking material and the sides of the joint may break down, allowing water to enter.  

Paints and lacquers

 are decorative coatings which, when applied to a teak deck, dry to form a continuous 

film over the caulking material as well. Some paints will not dry properly where they come into contact 
with the caulking material, leaving the surface tacky. In time most paints will flake away along the line of 
the joint. This spoils the appearance of the teak deck and causes cracks to open up along the joints. 

Teak cleaners

 should be used only if they contain no other active ingredients apart from normal soap. 

Additives such as phosphoric or oxalic acid, which are often incorporated as brighteners, are corrosive 
substances which attack both the caulking material and the timber, causing them to age rapidly. 
We therefore recommend that teak decks be swabbed down with a mop and clean fresh water, to which a 
small quantity of normal soap may be added if desired. Heavy soiling may be removed by scrubbing with 
a hard sponge. The use of a power washer is not recommended. The 

high-pressure water jet

 will remove 

areas of sapwood and break the seal between the caulking material and the sides of the joint. 
In extended periods of hot, dry weather teak decks should be watered at regular intervals to prevent the 
timber from during out completely. Excessive loss of moisture will cause the timber to shrink, placing the 
joints under stress. Under unfavourable conditions this can lead to premature ageing or failure of the joint 
seal. 

Note: 

− 

Please remember: Damage to the cloth is mainly caused if it is
incorrectly treated or handled. Especially if you let it shake, expose it
to UV rays constantly or store it improperly. 

− 

If there are any questions on the cloths do not hesitate to contact the
manufacturer or your sailmaker. 

− 

Never remove track cars with ball bearings from the tracks carelessly.
Always use sheet tracks with endstops

Содержание BAVARIA 32

Страница 1: ...Manual for Owners and Skippers Sailing yacht BAVARIA 32 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Страница 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC instal...

Страница 3: ...lities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressin...

Страница 4: ...n Actually the EC Directive intends for yachts of this size the certification module Aa only That means that the manufacturer certifies the correspondence of construction and equipment with the Direct...

Страница 5: ...code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see Declaration of Conformity Warnings Many chapters of this manual will support a troublefr...

Страница 6: ...ries out changes on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 32 Type Keelyacht Series number of the hull DE BAVU32Y0E30...

Страница 7: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 7...

Страница 8: ...rt 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Si...

Страница 9: ...ded fixed propeller made from an aluminium alloy Option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection option socket CEE plug current operated 230 V e...

Страница 10: ...2 Bavaria Yacht Bau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresail reef...

Страница 11: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 11 1 2 2 Deck arrangement...

Страница 12: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 12 1 2 3 Accomodation plan...

Страница 13: ...per shroud 2x permanent backstay tackle 1x Running Rigging Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional tripp...

Страница 14: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 14 Engine plant...

Страница 15: ...the pantry An interruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut...

Страница 16: ...s supplied via a suction pipe from the upper edge of the tank Due to the short distance a fire proof fuel pipe is used This is led via a wide meshed filter water separator fuel pump and fine filter to...

Страница 17: ...d secured at the top of the tiller wheel The steering wheel got a built in brake which you can fasten Make always sure that this brake is not tight especially when sailing with the auto pilot This wou...

Страница 18: ...installed at the transom of the yacht The power is supplied into a shore connection unit placed under the chart table The plug box is operational as soon as the shore supply cable has been plugged in...

Страница 19: ...s have absolute priority In case of a lack of capacity all other consumers have to be switched off first By a stand by operation of the engine even when under sail the batteries can be brought up rath...

Страница 20: ...ce and maintenance must be carried out by a qualified specialist Warning To avoid the danger of a rush of current or fire The shore connection cable must never hang into water Plug the shore connectio...

Страница 21: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 21 2 5 6 Distribution of electric devices...

Страница 22: ...atterie 55 Ah 1 Bord battery 140 Ah Bordstromkreis Batterie 140 Ah 1 o 2 16 Battery charger option Batterieladeger t Option 1 17 Electric panel Elektro Panel 1 18 Main switch Batterie Hauptschalter 1...

Страница 23: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 23 2 5 7 Wiring plans...

Страница 24: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 24 2 5 8 Distribution plans...

Страница 25: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 25 2 5 9 AC distribution...

Страница 26: ...replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require care...

Страница 27: ...ust gas pipes at least once a year Replace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of mater...

Страница 28: ...t the position and use of all fire extinguishers and the fire retarding cloth the position and function of the opening for the extinguisher s nozzle in the engine room bulkhead the exit through the es...

Страница 29: ...eplaced if necessary A constant flow of sea water has to be guaranteed The hose is secured at its joints with two clips If there is an interruption of the sea water flow the temperature sensor in the...

Страница 30: ...se nipples All hose connections are secured with two clips each For the cockpit drain special plastic joints are used Maintenance note The tightness of board ducts should be inspected regularly Check...

Страница 31: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 31 Board ducts...

Страница 32: ...t exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should...

Страница 33: ...between the caulking material and the sides of the joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continuous f...

Страница 34: ...ade out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As an...

Страница 35: ...tions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engine manual Store the fully charged batteries at a ventilated fros...

Страница 36: ...per to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitable mean...

Страница 37: ...working instructions hand operated bilge pump compass bilge pump WC instruction elapsed time indicator Proof of identity to be completed by the dealer or party to the contract 1 First launch 2 Date of...

Страница 38: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 38...

Страница 39: ...32 Bavaria Yacht Bau GmbH 39 39 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 32 HIN DE BAVU32Y0E303 Signature _____________________...

Отзывы: