background image

Bavaria 32 

 

Bavaria Yacht Bau GmbH 

(39) 

– 18 –

2.4.1 Description of the pumping arrangement 

The yacht is equipped with both a manual pump and an electric bilge pump. The main line bilge suction 
has a capacity of 75 l/min. 
 

A draw bucket is an ideal means for bailing out water . It should always be ready in a 

cockpit seat locker. 

 

 

Attention 

Close all sea valves if you leave your yacht for a longer period. Valves being not 
clearly visible, like e.g. in the toilet room, should only be opened before use and 
closed short after. 
 

Warning 

In a serious situation, e.g. in case of a heavy inrush of water as a consequence of a 
collision, the pumping capacity might not be sufficient. Take measures for damage 
control with collision mats or other suitable means.

 

 

 
 
 
 
 
 
 
 
 
 
 

Components of the bilge pumping installation: 

 

see pic 2.1.1. 

 
 

2.5 The electric installation 
2.5.1 The AC-installation 

The yacht has got a shore connection (option) by which it can be supplied with electric power from 
ashore when being berthed in a port. The plug box ( meeting the CEE-norm) is installed at the transom of 
the yacht. The power is supplied into a shore connection unit, placed under the chart table.

 

The plug box is operational as soon as the shore supply cable has been plugged in. It only serves the ope- 
ration of electric machines. 

 

2.5.2 The DC–board net 

All electric devices aboard are supplied with the 12 V DC. A main-switch is installed in the electric panel 
at the chart table. Power distribution is effected by a switchboard above the chart table.The lettering next 
to each switch refers to the corresponding consumer. 
 
You can find all the switches for the 12 V consumers at the switchboard. By this you can operate different 
consumer-groups ,being marked with logos or lettering, separately. Some of the switches are designed for 
an installation of additional electric devices. There are only automatic fuses used. So you only have to 
press them in case of a breakdown. If a fuse blows repeatedly you should spot the cause or consult a 
specialist (electrician). 
 
 

Note 

In case of spherical valves a transverse lever-direction indicates: 
CLOSED  
and a longitudinal ones means : OPEN 
 

Maintenance note 

The tightness of ducts should be inspected regularly.  
Retighten all hose clips and the stuffing boxes of valves 

Содержание BAVARIA 32

Страница 1: ...Manual for Owners and Skippers Sailing yacht BAVARIA 32 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Страница 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC instal...

Страница 3: ...lities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressin...

Страница 4: ...n Actually the EC Directive intends for yachts of this size the certification module Aa only That means that the manufacturer certifies the correspondence of construction and equipment with the Direct...

Страница 5: ...code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see Declaration of Conformity Warnings Many chapters of this manual will support a troublefr...

Страница 6: ...ries out changes on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 32 Type Keelyacht Series number of the hull DE BAVU32Y0E30...

Страница 7: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 7...

Страница 8: ...rt 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Si...

Страница 9: ...ded fixed propeller made from an aluminium alloy Option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection option socket CEE plug current operated 230 V e...

Страница 10: ...2 Bavaria Yacht Bau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresail reef...

Страница 11: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 11 1 2 2 Deck arrangement...

Страница 12: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 12 1 2 3 Accomodation plan...

Страница 13: ...per shroud 2x permanent backstay tackle 1x Running Rigging Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional tripp...

Страница 14: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 14 Engine plant...

Страница 15: ...the pantry An interruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut...

Страница 16: ...s supplied via a suction pipe from the upper edge of the tank Due to the short distance a fire proof fuel pipe is used This is led via a wide meshed filter water separator fuel pump and fine filter to...

Страница 17: ...d secured at the top of the tiller wheel The steering wheel got a built in brake which you can fasten Make always sure that this brake is not tight especially when sailing with the auto pilot This wou...

Страница 18: ...installed at the transom of the yacht The power is supplied into a shore connection unit placed under the chart table The plug box is operational as soon as the shore supply cable has been plugged in...

Страница 19: ...s have absolute priority In case of a lack of capacity all other consumers have to be switched off first By a stand by operation of the engine even when under sail the batteries can be brought up rath...

Страница 20: ...ce and maintenance must be carried out by a qualified specialist Warning To avoid the danger of a rush of current or fire The shore connection cable must never hang into water Plug the shore connectio...

Страница 21: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 21 2 5 6 Distribution of electric devices...

Страница 22: ...atterie 55 Ah 1 Bord battery 140 Ah Bordstromkreis Batterie 140 Ah 1 o 2 16 Battery charger option Batterieladeger t Option 1 17 Electric panel Elektro Panel 1 18 Main switch Batterie Hauptschalter 1...

Страница 23: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 23 2 5 7 Wiring plans...

Страница 24: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 24 2 5 8 Distribution plans...

Страница 25: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 25 2 5 9 AC distribution...

Страница 26: ...replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require care...

Страница 27: ...ust gas pipes at least once a year Replace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of mater...

Страница 28: ...t the position and use of all fire extinguishers and the fire retarding cloth the position and function of the opening for the extinguisher s nozzle in the engine room bulkhead the exit through the es...

Страница 29: ...eplaced if necessary A constant flow of sea water has to be guaranteed The hose is secured at its joints with two clips If there is an interruption of the sea water flow the temperature sensor in the...

Страница 30: ...se nipples All hose connections are secured with two clips each For the cockpit drain special plastic joints are used Maintenance note The tightness of board ducts should be inspected regularly Check...

Страница 31: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 31 Board ducts...

Страница 32: ...t exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should...

Страница 33: ...between the caulking material and the sides of the joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continuous f...

Страница 34: ...ade out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As an...

Страница 35: ...tions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engine manual Store the fully charged batteries at a ventilated fros...

Страница 36: ...per to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitable mean...

Страница 37: ...working instructions hand operated bilge pump compass bilge pump WC instruction elapsed time indicator Proof of identity to be completed by the dealer or party to the contract 1 First launch 2 Date of...

Страница 38: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 38...

Страница 39: ...32 Bavaria Yacht Bau GmbH 39 39 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 32 HIN DE BAVU32Y0E303 Signature _____________________...

Отзывы: