BE1-50/51B-217 Testing
5-2
B E 1 - 5 0 / 5 1 B
9
8
7
6
5
4
2
T I M E
I N S T
3
C U R R E N T
S O U R C E
I N P U T
S T O P
T I M E R
S T A R T
A M P S
T E S T S E T
12-17-99
D2750-26.vsd
1.0Aac
C U R R E N T
L I M I T E R
T A R G E T C U R R E N T
Figure 5-1. Pickup and Timing Test Setup
Figure 5-2. Target Operational Test Setup
Содержание BE1-50/51B-217
Страница 19: ...BE1 50 51B 217 General Information 1 14 MULTIPLES OF PICK UP Figure 1 11 Time Characteristic Curve I Inverse...
Страница 26: ...BE1 50 51B 217 Controls and Indicators 2 3 Figure 2 2 Location of Controls and Indicators...
Страница 29: ...BE1 50 51B 217 Functional Description 3 3 Figure 3 1 Functional Block Diagram...
Страница 31: ...BE1 50 51B 217 Installation 4 2 Figure 4 1 Panel Drilling Diagram S1 Case Semi Flush Mount...
Страница 33: ...BE1 50 51B 217 Installation 4 4 Figure 4 3 Panel Drilling Diagram S1 Case Projection Mount...
Страница 35: ...BE1 50 51B 217 Installation 4 6 Figure 4 4 Outline Dimensions BE1 50 51B S1 Case Projection Mount...
Страница 37: ...BE1 50 51B 217 Installation 4 8...
Страница 38: ...BE1 50 51B 217 Installation 4 9 Figure 4 6 DC Control Connections And Jumper Configuration Terminals...
Страница 39: ...BE1 50 51B 217 Installation 4 10 9 8 10 7 5 3 1 6 4 2 CT GND 51 50 AUX D1146 16 04 23 96 OVERCURRENT...
Страница 40: ...BE1 50 51B 217 Installation 4 11 Figure 4 7 BE1 50 51B 217 Overcurrent Relay Rear View...