BE1-50/51B-217 Testing
5-3
NOTES
When testing TIME overcurrent functions, INST PICKUP settings of 00 will affect the
calibration of the TIME functions. TIME PICKUP settings of 00 also affect INST
functions.
Test Procedure
Time Pickup Test
Perform preliminary setup:
Connect test setup as shown in Figure 5-1.
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to OFF (selects
instantaneous reset).
Set TIME DIAL to 0.0.
Set CURVE to S
Set TIME PICKUP to 0.5.
Set INST PICKUP to 90.
Step 1. Slowly increase current to terminals 8 and 9. PICKUP LED should turn ON at a maximum input
current of 0.550 ampere.
Step 2. Decrease input current until PICKUP LED turns OFF.
Step 3. Set TIME PICKUP to 2.2.
Step 4. Slowly increase current to terminals 8 and 9. PICKUP LED should turn ON at an input current of
2.131 to 2.269 amperes.
Step 5. Decrease input current until PICKUP LED turns OFF.
INST Pickup Test
Perform preliminary setup:
Connect test setup as shown in Figure 5-1.
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to OFF (selects
instantaneous reset).
Set TIME DIAL to 0.0.
Set CURVE to S
Set TIME PICKUP to 15.1.
Set INST PICKUP to 01.
Step 1. Slowly increase current to terminals 8 and 9. INST contacts should close at an input current of
0.955 to 1.045 amperes.
Step 2. Decrease input current until INST output contacts open.
Step 3. Set INST PICKUP to 08.
Содержание BE1-50/51B-217
Страница 19: ...BE1 50 51B 217 General Information 1 14 MULTIPLES OF PICK UP Figure 1 11 Time Characteristic Curve I Inverse...
Страница 26: ...BE1 50 51B 217 Controls and Indicators 2 3 Figure 2 2 Location of Controls and Indicators...
Страница 29: ...BE1 50 51B 217 Functional Description 3 3 Figure 3 1 Functional Block Diagram...
Страница 31: ...BE1 50 51B 217 Installation 4 2 Figure 4 1 Panel Drilling Diagram S1 Case Semi Flush Mount...
Страница 33: ...BE1 50 51B 217 Installation 4 4 Figure 4 3 Panel Drilling Diagram S1 Case Projection Mount...
Страница 35: ...BE1 50 51B 217 Installation 4 6 Figure 4 4 Outline Dimensions BE1 50 51B S1 Case Projection Mount...
Страница 37: ...BE1 50 51B 217 Installation 4 8...
Страница 38: ...BE1 50 51B 217 Installation 4 9 Figure 4 6 DC Control Connections And Jumper Configuration Terminals...
Страница 39: ...BE1 50 51B 217 Installation 4 10 9 8 10 7 5 3 1 6 4 2 CT GND 51 50 AUX D1146 16 04 23 96 OVERCURRENT...
Страница 40: ...BE1 50 51B 217 Installation 4 11 Figure 4 7 BE1 50 51B 217 Overcurrent Relay Rear View...