![Basler BE1-50/51B-217 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/basler/be1-50-51b-217/be1-50-51b-217_instruction-manual_2707496045.webp)
BE1-50/51B-217 Testing
5-5
CAUTION
Trip circuit voltage is present at the front panel test points. When shorting the test
points, use insulated jumpers to avoid contact with these voltages.
Manual Trip Test
Perform preliminary setup:
Connect test setup as shown in Figure 5-2.
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to OFF (selects
instantaneous reset).
Set TIME DIAL to 4.5.
Set CURVE to S
Set TIME PICKUP to 1.0.
Set INST PICKUP to 01.
Step 1. Set target current source to 1.0 ampere, ac.
Step 2. Apply 0.9 ampere input current to terminals 8 and 9.
Step 3. Connect a jumper between TIME MANUAL TRIP test points. Check that TIME target operates.
Step 4. Connect a jumper between INST MANUAL TRIP test points. Check that INST target operates.
Step 5. Reset targets.
Integrating Reset Test
Perform preliminary setup:
Insure that SW8 switches are set correctly: SW8-1 for operating frequency, SW8-2 to OFF (no
instantaneous delay), SW8-3 to OFF (no instantaneous delay), and SW8-4 to ON (selects
integrating reset).
Set TIME DIAL to 4.5.
Set CURVE to I.
Set TIME PICKUP to 1.0.
Set INST PICKUP to 90.
Step 1. Set target current source to 1.0 ampere, ac.
Step 2. Read all of Step 3 before beginning Step 3.
Step 3. Apply 4.0 amperes input current to terminals 8 and 9. After the unit trips, remove the input
current for 20 ±0.25 seconds, then reapply the 4.0 amperes input current. Record the elapsed
time from the reapplication of input current to the output retrip.
Result: Elapsed time should be 1.55 ±0.3 seconds.
Содержание BE1-50/51B-217
Страница 19: ...BE1 50 51B 217 General Information 1 14 MULTIPLES OF PICK UP Figure 1 11 Time Characteristic Curve I Inverse...
Страница 26: ...BE1 50 51B 217 Controls and Indicators 2 3 Figure 2 2 Location of Controls and Indicators...
Страница 29: ...BE1 50 51B 217 Functional Description 3 3 Figure 3 1 Functional Block Diagram...
Страница 31: ...BE1 50 51B 217 Installation 4 2 Figure 4 1 Panel Drilling Diagram S1 Case Semi Flush Mount...
Страница 33: ...BE1 50 51B 217 Installation 4 4 Figure 4 3 Panel Drilling Diagram S1 Case Projection Mount...
Страница 35: ...BE1 50 51B 217 Installation 4 6 Figure 4 4 Outline Dimensions BE1 50 51B S1 Case Projection Mount...
Страница 37: ...BE1 50 51B 217 Installation 4 8...
Страница 38: ...BE1 50 51B 217 Installation 4 9 Figure 4 6 DC Control Connections And Jumper Configuration Terminals...
Страница 39: ...BE1 50 51B 217 Installation 4 10 9 8 10 7 5 3 1 6 4 2 CT GND 51 50 AUX D1146 16 04 23 96 OVERCURRENT...
Страница 40: ...BE1 50 51B 217 Installation 4 11 Figure 4 7 BE1 50 51B 217 Overcurrent Relay Rear View...