background image

                                                                                                                                                   
PAGE - 9 - 

By the user on site  

Programmrad

Tageszeit

Regenerations-
zeitpunkt

Regenerationsintervalle

Regenerations-
nockenrad

Aktuator

 

  The device is factory adjusted. The fine tuning is done by the user on site.  

  Insert the main plug.  

  Open the water supply to the water softening device.  

  The water pressure must be at least 2 bars and a maximum of 6 bars.  

  For the first 3 minutes drain the water to the sewer.  

  Loose the screw of the controller’s cover and remove the front cap.  

  Slowly turn the programme dial counter clockwise until the backwash section on the re-

generation dial is pushed in and the actuator is started in order to open the drain valve
the regeneration cycles must perform the specific number of revolutions depending on the 
amount pressed

;

 the valve will be shifted to the salt release position / slow washing.  

  Check the brine inlet by listening or touching it.  

  Slowly turn the programme dial counter clockwise until the actuator is released and the 

drain valve is closed; the valve is now back in the service position.   

  Set the time of day. In order to do this, slowly turn the programme dial counter clock-

wise (in the direction of the arrow) until the current time of day is reached. (A = 0-11, P = 
12-23).  

  Determine the daily demand (for example: 500 litres). 

  Determine the local total hardness (example: 16 °dH). 

  Determine the regeneration frequency as follows: Divide the efficiency of the total hard-

ness (e.g.: 16,000 litres of hard water divided by 16 °dH equals 1,000 litres of actual out-
put ). Then divide the actual capacity by the daily demand (example: 1,000 of actual out-
put divided by 500 litres of daily demand equals 2 regeneration cycles).  

  Transfer the number of regeneration cycles to the regeneration dial. Each pressed metal 

element corresponds to one day of regeneration (example: all 7 metal elements pulled 
out. If the regeneration cycle is 2 days, the every second metal element is pushed in). 

Programme dial  

Regeneration frequency 

Actuator 

Regeneration dial 

Time of day  

Regeneration time  

Содержание GAHOtech soft MC-N 16

Страница 1: ...Location of installation Please read the operating manual before startup The manufacturer is not responsible for malfunctions caused by faulty operation and failure to comply with the provisions of t...

Страница 2: ...allation 7 2 1 Installation preparation plan 7 2 2 Dismanteling and utilization 7 3 Installation 8 4 Startup 8 5 Maintenance and service instructions 10 6 Troubleshooting 10 7 Spare parts 11 8 Product...

Страница 3: ...ible for any damage caused by water 9 The proper name and serial number of the device must be provided with any enquiries and ordering of spare parts Only then an effective and quick reply or order im...

Страница 4: ...ted water Formed scale formation hinders perform ance of a device or instrumentation and leaves undesirable resi due Increased consumption reduced The consequences of scale deposition are increased co...

Страница 5: ...e for dishwashers with soft water 0 dH total hardness or to the desired hardness level System structure manifold optional connections set optional water softening device 1 2 Device operation The optio...

Страница 6: ...roperly opened see figure on page 9 By turning a screwdriver counter clockwise increase the amount of tap water in the soft wa ter Check the water hardness in the regulated soft water 1 4 Technical de...

Страница 7: ...nd waste management Installation preparation plan for the purchaser Project The set includes manifold optional connections set optional water softening device dimensions width 310 mm depth 520 mm heig...

Страница 8: ...heck and tighten all fittings connecting the device Connect to electric power 4 Start up By the technical support personnel The device is factory adjusted The fine tuning is done by technical support...

Страница 9: ...e dial counter clockwise until the actuator is released and the drain valve is closed the valve is now back in the service position Set the time of day In order to do this slowly turn the programme di...

Страница 10: ...cloth The attached product card should also be regularly filled in Only then adequate mainte nance is provided 6 Troubleshooting Malfunction Cause Solution The device is not re sponding a Interrupted...

Страница 11: ...ing device b Clean the valve and add clari fier to the resin layer Regen erate more frequently c Valve inlet blocked by for eign bodies that dissolved in the pipes during previ ous works performed rel...

Страница 12: ...roduct card Client s address Number of hard water litres 16000 Total hardness Efficiency Hardness Date Salt tablets veri fied supplemented Pre filter op tional re placed Water hardness utility water W...

Отзывы: