Basics
10
Aircraft Refuelling, Operating Instructions, BA 090323, (07.03.2022)
Symbol
Meaning
Effect
Connection test
When TCP communication is activated, a test message
(ping) is sent to the office.
FTL/FTP-Data transfer
When the FTP communication is activated, the return run
data are generated, the WLAN interface is switched on and
FTL/FTP communication between the vehicle and the office
is started. When all the files have been exchanged, the
WLAN interface is switched off again.
Start download
The software download from the BARTEC server (Service
menu) is started.
Cancel download
The software download from the BARTEC server (Service
menu) is cancelled.
Print copy
Prints a copy of the delivery note.
Order complete
Finishes the current order and sends the message „Order
complete“ to the office.
Check Interlock inputs
The current states of the configured interlock inputs are
displayed.
System Switch off
The system is switched off properly, shutting down all
modules.
Water test
The message "Water test performed" is sent.
(Available when the FOI interface is used and when the
parameter „
Fehler! Verweisquelle konnte nicht gefunden
werden.
“ in the menu
Fehler! Verweisquelle konnte nicht
gefunden werden.
is activated.)
send OK
Sends the message „OK“
(This softkey is available only with FOI-interface.)
Dialog request
A dialog request is sent to the dispatcher.
(The softkey is only available when the BARTEC interface
is used.)
Edit flight data
From the large display of the flight data out editing the flight